Has the earthworks been completed to plan?
-
Is site clean from litter and scraps?
-
Is the erosion management system in place and adequate?
-
Are ditches adequate?
-
Are there any signs of instability (cracking, slumping, etc.)
-
Have any unexpected conditions (permafrost, springs, etc.) been encountered?
-
Are cuts >3m tall appropriately back-sloped to reduce instability?
-
Any sections likely to be impassable with pickup (UTV evacuation plan required?)
-
Comments / Deficiencies Identified:
-
Are sumps build to an appropriate size?
-
Take at least 4 photos facing N, E, S, W respectively.
-
Has the pad been approved by the drill foreman?