Title Page

  • Site Conducted

  • Conducted on

  • Prepared by

  • Planned ID

General

  • Does the route cross streams requiring a culvert?

  • Will the culvert be >1 metre diameter?

  • Any signs of instability or apparent slide paths?

  • Is tree clearing minimized by the route?

  • Does the route cross or climb significant slopes (>35° for over 10 m)?

  • Are any cut banks higher than 3 m anticipated

  • Is an erosion management plan in place?

  • Any signs of subsurface water flow along the route?

  • Is the road-building material suspected to create ARD?

  • Is the operator competent and authorized to conduct the earthworks?

  • Comments / Deficiencies Identified:

  • Take at least 4 photos facing N, E, S, W respectively.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.