Title Page
-
Site Conducted
-
Conducted on
-
Prepared by
-
Planned ID
General
-
Does the route cross streams requiring a culvert?
-
Will the culvert be >1 metre diameter?
-
Any signs of instability or apparent slide paths?
-
Is tree clearing minimized by the route?
-
Does the route cross or climb significant slopes (>35° for over 10 m)?
-
Are any cut banks higher than 3 m anticipated
-
Is an erosion management plan in place?
-
Any signs of subsurface water flow along the route?
-
Is the road-building material suspected to create ARD?
-
Is the operator competent and authorized to conduct the earthworks?
-
Comments / Deficiencies Identified:
-
Take at least 4 photos facing N, E, S, W respectively.