Title Page

  • Property Address

  • Deal ID

  • Date Reported

  • Prepared by

Nature of Defect/Failure

NATURE OF DEFECT/FAILURE AS REPORTED

  • Describe the nature of the defect/failure reported.

  • Who reported defect/failure to Heatic.

  • Date defect/failure reported to Heatic

  • When was the system commissioned.

OUTCOME

  • Was the failure/defect due to an equipment failure?

  • Which equipment failed?

  • Who manufactured the failed equipment

  • Which component failed

  • Did the manufacturer replace under warranty?

  • Was the failure/defect due to workmanship?

  • Did the installer repair at own cost

  • How much did the defect cost to repair?

  • Has the original installer contra charged

  • Date defect corrected

FURTHER CORRECTIVE ACTION/CLOSURE

  • Are there any further actions to be taken to prevent a repetition of this form of defect.

  • Describe further corrective action

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.