Title Page
-
Property Address
-
Deal ID
-
Date Reported
-
Prepared by
Nature of Defect/Failure
NATURE OF DEFECT/FAILURE AS REPORTED
-
Describe the nature of the defect/failure reported.
-
Who reported defect/failure to Heatic.
-
Date defect/failure reported to Heatic
-
When was the system commissioned.
OUTCOME
-
Was the failure/defect due to an equipment failure?
-
Which equipment failed?
-
Who manufactured the failed equipment
-
Which component failed
-
Did the manufacturer replace under warranty?
-
Was the failure/defect due to workmanship?
-
Did the installer repair at own cost
-
How much did the defect cost to repair?
-
Has the original installer contra charged
-
Date defect corrected
FURTHER CORRECTIVE ACTION/CLOSURE
-
Are there any further actions to be taken to prevent a repetition of this form of defect.
-
Describe further corrective action