Title Page

  • Site conducted

  • Site URN

  • Site Address

  • Panel Size

  • Panel Type

  • Installed By:

  • Date(s) of Completion

  • Photo of Completed Panel

QUALITY OF WORKS

  • Have all legacy panels been satisfactorily removed?

  • Have all fixings been removed or made safe?

  • Has any graffiti or obstructions been satisfactorily cleared?

  • Has other wall mounted services and signage been removed or relocated?

  • Is the paintwork on the steelwork completed to a satisfactory standard?

  • Is the fascia / trim aligned and secure?

  • Are the tiles on the screen properly in place and flush with each other?

  • Have the recommended number of pull tests been completed? (Photos MUST be provided)

  • Are there any visible defects with the digital screen or surround?

  • Does the surrounding area detract from the digital screen?

  • Has the trunking been painted if required?

  • Is the height and position of the digital screen(s) correct? (As per planning drawings)

  • Have any remedial works to the wall or substrate been completed as requested?

  • Has the works area been left clean, tidy and in safe condition?

HANDOVER OF DOCUMENTATION AND RECORDS

  • Has the as built drawing been fully annotated? (checked and marked up accordingly with any changes)

  • Have the relevant Site Acceptance Tests (SAT) been completed? (Where applicable)

  • Has the daily signing in and out sheet been returned?

  • Has the signed site induction form been returned?

  • Has the signed RAMS briefing sheet been returned?

  • Has the site based risk assessment been satisfactorily completed?

  • Have all certs, permits and cards been checked to ensure they are valid?

  • Have the signed permit to work forms been returned?

  • Have any plant and equipment check sheets been returned?

  • Have any site briefings or toolbox talks been delivered?

  • Have all photos of the digital screen screen been taken and returned? (Including pods and tiles)

HEALTH AND SAFETY

  • Have the correct chapter 8 barriers / heras fencing panels been used? (Please provide photos)

  • Has the correct signage been used and displayed? (Please provide photos)

  • Has the correct PPE and RPE been worn as per RAMS? (Please provide photos)

  • Have any non-conformances been raised during a site inspection? (Where applicable)

  • Has an IRF been completed for any incidents, near misses or close calls? (Where applicable)

  • Is lifting equipment properly tagged and inspected? (Please state when next LOLER is due)

  • Have safety harnesses and lanyards been inspected and safe to use (Please state date of last inspection)

Completion

  • Site Supervisor (Name):

  • Accepted by (Name):

  • Comments or Actions Required

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.