Title Page
-
Job Number/Name
-
Conducted on
-
Location
-
Prepared by
Pre-works Inspection
-
Signature of the person completing the form
Gang members
-
Name:
-
Arrive on site:<br>Is works safe to proceed?
-
You are required to take Pictures on arrival
-
Please capture pictures of the overall area on arrival
-
Weather conditions on site (tick applicable)
- Dry
- wet
- Windy
- Cold
- Raining
- Sunny
- Hot
- Cloudy
- Light
- Dark
- Fog
- Snow
- Overcast
- Other
-
Other weather
-
Have you identified any pre-existing defects or issues before you start
-
RAMS: You agree you have:<br>Read, had access to, and understood before undertaking the works?<br><br>https://erhcomms.sharepoint.com/:f:/s/iAuditor/ElK9u6NKOhdLrz45Dqdwr00B-RHwksgh_vmMvxCvH6U4Ww?e=FoRJbj
-
DO NOT START WORKS, please contact your Line Manager before you proceed
once you have obtained the RAMs via line manager you can then continue -
RAMS send via other means
-
Close the site
-
When all requirements are met and rams are obtained please carry on
-
DO NOT CONTINUE , contact your Supervisor/Line Manager and seek advice
Safety Inspection/ Documents
-
You know where to find HSE safety boards/documents and regularly check for updates?
-
https://resources.hse.gov.uk/notices/
-
You agree, you hold the necessary <br>• Training <br>• qualifications, <br>• accreditation's<br>• tickets <br>to undertake the works assigned?<br><br>(if working within a team/Gang at least one of you hold the above)<br>
-
STOP WORKS contact your Line Manager
-
If you feel like you do not have the correct qualifications/Accreditation or training assigned to you , do not continue, until you seek advise and guidance from your line manager
NOTE :
you can find out about
Expiry dates
qualifications
accreditation's
all from ERH office -
ID cards carried?<br>
-
ID cards
-
PPE used? (Personal Protective Equipment)
- Head protection (e.g. safety helmets)
- Body protection (e.g. high-visibility clothing)
- Ear protection (e.g. earplugs)
- Eye protection (e.g. goggles)
- Hand and arm protection (e.g. gloves)
- Foot protection (e.g. steel toecap boots)
- Skin protection (e.g. protective clothing)
- Respiratory Protective Equipment (RPE)
- Fall protection (e.g. safety harnesses).
- Other
-
ERH policy on PPE is:
*Hard Hats will be worn at all times*
*Some sites including other contractors or project my implement the 5 point PPE system -
PPE Condition
-
Items in question
- Head protection (e.g. safety helmets)
- Body protection (e.g. high-visibility clothing)
- Ear protection (e.g. earplugs)
- Eye protection (e.g. goggles)
- Hand and arm protection (e.g. gloves)
- Foot protection (e.g. steel toecap boots)
- Skin protection (e.g. protective clothing)
- Respiratory Protective Equipment (RPE)
- Fall protection (e.g. safety harnesses).
- Other
-
Please consider renewing the item/s before it becomes poor
-
Items in question
- Head protection (e.g. safety helmets)
- Body protection (e.g. high-visibility clothing)
- Ear protection (e.g. earplugs)
- Eye protection (e.g. goggles)
- Hand and arm protection (e.g. gloves)
- Foot protection (e.g. steel toecap boots)
- Skin protection (e.g. protective clothing)
- Respiratory Protective Equipment (RPE)
- Fall protection (e.g. safety harnesses).
- Other
-
Manual handling practices understood and adhered to?<br><br>(i.e. correct lifting/carrying techniques, two person lifts or mechanical lifting equipment)
Welfare Inspection
-
First Aid Kit: <br>In date and complete?
-
Adequate local Welfare Facilities available?
-
Have you considered adequate means of hydration during the tasks?
Environment / Surroundings
-
Have you identified any spills?
-
Do you have Spill Kits?
-
If you encounter any spills, contact ERH H&S immediately who will advise you of your course of action
Departments
-
Please select your work discipline (only complete the department(s) relevant to your role)
- Civils
- TM
- Slots
- ITS
- Maintenance
- Fibre
- Surveying
-
Are you working under TM?
-
Do you reqire the use of CAT & Genny?
-
Cable avoidance equipment serviceable and calibrated?<br> Pictures to include:<br> * CAT<br> * Genny<br> * S/N and calibration TAG
-
Show markings as evidence before breaking ground
-
Plant used serviceable and in working order?
-
Mechanical tools and equipment used serviceable and in working order?
-
Hand held tools used serviceable and in working order?
-
Safety guards and emergency stop functionalities?<br><br>Are they all present and fully working?
-
STOP do not carry on. contact your line manager
-
Hand-arm vibration syndrome recording <br><br>Operatives are required to log time spent and report to line manager
-
Stop what your doing and contact your line manger before you continue
Individual time record
-
Name
-
Equipment 1
-
Time
-
Equipment 2
-
Time
-
Equipment 3
-
Time
-
Equipment 4
-
Time
-
(Comming soon)
-
Are you working under TM?
-
Do you reqire the use of CAT & Genny?
-
Cable avoidance equipment serviceable and calibrated?<br> Pictures to include:<br> * CAT<br> * Genny<br> * S/N and calibration TAG
-
Show markings as evidence before breaking ground
-
Plant used serviceable and in working order?
-
Mechanical tools and equipment used serviceable and in working order?
-
Hand held tools used serviceable and in working order?
-
Safety guards and emergency stop functionalities?<br><br>Are they all present and fully working?
-
STOP do not carry on. contact your line manager
-
Hand-arm vibration syndrome recording <br><br>Operatives are required to log time spent and report to line manager
-
Stop what your doing and contact your line manger before you continue
Individual time record
-
Name
-
Equipment 1
-
Time
-
Equipment 2
-
Time
-
Equipment 3
-
Time
-
Equipment 4
-
Time
-
Are you working under TM?
Job capture
-
MP
-
assit
-
pictures
-
issues
-
Detials
-
Are you working under TM?
-
Please select what work sheet/s you will be using
- SI001 Electrical Testing.
- SI002 Transmission Buildings.
- SI003 IT Equipment.
- SI004 Tunnels.
- SI005 ETS.
- SI006 CCTV.
- SI007 Signs.
- SI008 Signals.
- SI009 TCL and Midas.
- SI010 MET.
- SI011 MVMS.
- SI013 JTC.
- SI014 TRT.
Job capture
-
MP
-
assit
-
pictures
-
issues
-
Detials
-
Are you working under TM?
General
-
Will you require a splicer?
-
Splicer in good working order no defects?
-
Photos of:
* face of the unit
* serial number -
Discribe the issue/s
-
Report to line manager
-
Splicer in date and calibrated?
-
Report to Line Manager
Fibre Build
-
Are you completing a build?
-
Hand tools and equipment serviceable and in good working order?
-
Cabinet built to spec ready for install?
-
Enough cable coiled ready to complete build?
Fibre Testing
-
Are you testing?
-
OTDR (Optical Time Domain Reflectometer) serviceable and in working order?
-
Are you using a VFL (Visual Fault Locator)?
-
Are you using an optical light source and a power meter, or an Optical Loss Test Set (OLTS)?
-
Do you have A fiber identifier (FI)
-
Type of Survey
Post Works Inspection
-
If complete site must be closed down and made safe<br><br>any ongoing works that need to stop temporarily must be made safe, clear and free from debris ready to be continued
-
Post work finished on site photos are to include:
* the overall view of the area,
* Showing the site clear from debris
* Showing site safe
* Showing site clean
Post work, Finished on site pictures
-
Picture
-
Any works that temporarily stop had to be made safe to the public that will include:
* Cleaning the area
* Protecting the assets
* Making safe
Photographic evidence:
* the overall view of the area,
* Showing the site clear from debris
* Showing site safe
* Showing site clean
Temporarily closed site
-
Picture
Visitors
-
Visitors Details
-
Visit From
-
Reason for visit & contact details (name, company, phone number)
Reference Material
-
Documents (coming soon)
https://erhcomms.sharepoint.com/:f:/s/iAuditor/EnpSeS4bSjhCr0MZ2ZjR6uMBJi_tnQsxXOUCyWYtDF1PwA?e=l9xP4U