Title Page
-
Site conducted
-
Site conducted
-
Conducted on
-
Auditor
-
Auditee (leading site representative)
-
Summary or other notes
-
This HSQS tour can be carried out on both RTS WORK & SUB-CONTRACTOR / SUPPLIER WORK or either one.
1st question for both RTS & Subcontractor / supplier is Mandatory- if not applicable or not observed select 'No'
Select applicable good practice, improvement, major concern area/s and the hazard/s / subject related to it - multiple can be selected. leave a note for each selection. you can create an action and send it to any external email or you can just skip create action and just download the PDF once completed and send it to the site representative and HSEQ team CC'd in. The report will flag Improvement areas - at the end of the report it will ask you to create an action, if you have already done this you don't need to create another.
Classifications guidance for Good Practice or expected , Major Concern/s & Improvement areas is at the bottom of each report.
HSQS Tour
- RTS WORK - (Select 'No' if not applicable).
-
Are you observing RTS work?
-
Consider the following hazards / subjects / areas: Height, Lifting Operations, Buried Services & excavations, Plant & fleet, SSOW, confined spaces, COSHH, Drugs & Alcohol, Electricity, emergency preparedness & Fire, Musculoskeletal, Noise, Respiratory, Vibration, Welfare, Temporary Works, 'Individual', 'Job', 'Organising', Environment & sustainability & Quality
-
Any Good Practice/s?
-
Select the Good Practice/s - can be multiple
- Height
- Lifting Operations
- Buried Services & Excavations
- Plant & Fleet
- PR/59 Safe System of Work (SSOW) - (Trains, OTP, ALO, Runaway Risk, Sentinel)
- Confined Spaces
- COSHH
- Drugs & Alcohol
- Electricity
- Emergency Preparedness & Fire
- Musculoskeletal
- Noise
- Respiratory
- Vibration
- Welfare
- PR/60 Temporary Works
- Individual: Attitude, behaviour, capabilities, communication, health, well being
- Job: Access & egress, housekeeping, layout, materials, tools & equipment, PPE, work environment, site set-up, workload
- Organisation: communication, competence management, culture, design, documentation, monitoring, procedure, project management, resourcing, risk assessment, supervision, change management, Induction, work scheduling, Permits
- PR/29 Environment and Sustainability
- Quality - product, service, workmanship, TQ
- Other - Please provide detail in notes
-
Select 'Individual' Good Practice - can be multiple
- PR/37 Attitude
- PR/37 behaviour
- PR/26 Capabilities
- PR/06 Communication
- PR/52 Health
- PR/52 Well Being
- PR/01 Fatigue
- Other - Please provide detail in notes
-
Select 'Job' good Practice
- PR/51 Access & Egress
- PR/51 Housekeeping
- PR/51 Layout
- PR/64 Materials
- PR/12 Plant, Tools & Equipment
- PR/17 PPE
- PR/51 Work Environment
- PR/51 Site set-up
- PR/52 Workload
- PR/51 Signage & signals
- PR/51 Site security, Trespass & Public Interface
- PR/51 Lineside Materials
- Other - Please provide detail in notes
-
Select 'Organisation' Good Practice
- PR/06 Communication, Briefing and Coordination
- PR/26 Competence Management
- PR/37 Culture
- PR/11 Design
- PR/64 documentation
- PR/45 monitoring
- PR/19 Contractor Management
- PR/08 procedure
- project management
- PR/19 resourcing (supplier)
- PR/08 risk assessment
- PR/51 supervision
- work scheduling
- PR/22 Change Management (POWRA)
- PR/40 Induction
- PR/64 Roles & Responsibilities
- CPP
- WPP
- TBS
- Modern Slavery
- PR/08 Work At Height Permit
- PR/08 Permit to Dig
- PR/08 Confined Spaces Permit
- PR/08 Hot Works Permit
- PR/08 Permit to Lift
- PR/08 Electrical Permit
- PR/08 General permit to work
- Resources
- Other - Please provide detail in notes
-
Select 'Quality' Good Practice
- Product
- Workmanship
- TQ
- Service
- Snagging
- QA Checks
- Other: Please provide details in notes
-
Select 'SSOW' Good Practice
- SSOW
- Trains
- OTP
- ALO
- Runaway Risk
- Sentinel
- Other - please provide details in notes
-
Any risk control/s to Improve?
-
Select the risk controls to improve? - can be multiple
- Height
- Lifting Operations
- Buried Services & Excavations
- Plant & Fleet
- PR/59 Safe System of Work (SSOW) - (Trains, OTP, ALO, Runaway Risk, Sentinel)
- Confined Spaces
- COSHH
- Drugs & Alcohol
- Electricity
- Emergency Preparedness & Fire
- Musculoskeletal
- Noise
- Respiratory
- Vibration
- Welfare
- PR/60 Temporary Works
- Individual: Attitude, behaviour, capabilities, communication, health, well being
- Job: Access & egress, housekeeping, layout, materials, tools & equipment, PPE, work environment, site set-up, workload
- Organisation: communication, competence management, culture, design, documentation, monitoring, procedure, project management, resourcing, risk assessment, supervision, change management, Induction, work scheduling, Permits
- PR/29 Environment and Sustainability
- Quality - product, service, workmanship, TQ
- Other - Please provide detail in notes
-
Select 'Individual' Improvement/s- can be multiple
- PR/37 Attitude
- PR/37 behaviour
- PR/26 Capabilities
- PR/06 Communication
- PR/52 Health
- PR/52 Well Being
- PR/01 Fatigue
- Other - Please provide detail in notes
-
Select 'Job' Improvement/s- can be multiple
- PR/51 Access & Egress
- PR/51 Housekeeping
- PR/51 Layout
- PR/64 Materials
- PR/12 Plant, Tools & Equipment
- PR/17 PPE
- PR/51 Work Environment
- PR/51 Site set-up
- PR/52 Workload
- PR/51 Signage & signals
- PR/51 Site security, Trespass & Public Interface
- PR/51 Lineside Materials
- Other - Please provide detail in notes
-
Select 'Organisation' Improvement/s
- PR/06 Communication, Briefing and Coordination
- PR/26 Competence Management
- PR/37 Culture
- PR/11 Design
- PR/64 documentation
- PR/45 monitoring
- PR/19 Contractor Management
- PR/08 procedure
- project management
- PR/19 resourcing (supplier)
- PR/08 risk assessment
- PR/51 supervision
- work scheduling
- PR/22 Change Management (POWRA)
- PR/40 Induction
- PR/64 Roles & Responsibilities
- CPP
- WPP
- TBS
- Modern Slavery
- PR/08 Work At Height Permit
- PR/08 Permit to Dig
- PR/08 Confined Spaces Permit
- PR/08 Hot Works Permit
- PR/08 Permit to Lift
- PR/08 Electrical Permit
- PR/08 General permit to work
- Resources
- Other - Please provide detail in notes
-
Select 'Quality' Improvement/s
- Product
- Workmanship
- TQ
- Service
- Snagging
- QA Checks
- Other: Please provide details in notes
-
Select 'SSOW' Improvement/s
- SSOW
- Trains
- OTP
- ALO
- Runaway Risk
- Sentinel
- Other - please provide details in notes
-
Any major concerns with any risk control/s?
-
Select the major concern/s - can be multiple
- Height
- Lifting Operations
- Buried Services & Excavations
- Plant & Fleet
- PR/59 Safe System of Work (SSOW) - (Trains, OTP, ALO, Runaway Risk, Sentinel)
- Confined Spaces
- COSHH
- Drugs & Alcohol
- Electricity
- Emergency Preparedness & Fire
- Musculoskeletal
- Noise
- Respiratory
- Vibration
- Welfare
- PR/60 Temporary Works
- Individual: Attitude, behaviour, capabilities, communication, health, well being
- Job: Access & egress, housekeeping, layout, materials, tools & equipment, PPE, work environment, site set-up, workload
- Organisation: communication, competence management, culture, design, documentation, monitoring, procedure, project management, resourcing, risk assessment, supervision, change management, Induction, work scheduling, Permits
- PR/29 Environment and Sustainability
- Quality - product, service, workmanship, TQ
- Other - Please provide detail in notes
-
Select 'Individual' Major concern/s- can be multiple
- PR/37 Attitude
- PR/37 behaviour
- PR/26 Capabilities
- PR/06 Communication
- PR/52 Health
- PR/52 Well Being
- PR/01 Fatigue
- Other - Please provide detail in notes
-
Select 'Job' ' Major concern/s- can be multiple
- PR/51 Access & Egress
- PR/51 Housekeeping
- PR/51 Layout
- PR/64 Materials
- PR/12 Plant, Tools & Equipment
- PR/17 PPE
- PR/51 Work Environment
- PR/51 Site set-up
- PR/52 Workload
- PR/51 Signage & signals
- PR/51 Site security, Trespass & Public Interface
- PR/51 Lineside Materials
- Other - Please provide detail in notes
-
Select 'Organisation' Major concern/s
- PR/06 Communication, Briefing and Coordination
- PR/26 Competence Management
- PR/37 Culture
- PR/11 Design
- PR/64 documentation
- PR/45 monitoring
- PR/19 Contractor Management
- PR/08 procedure
- project management
- PR/19 resourcing (supplier)
- PR/08 risk assessment
- PR/51 supervision
- work scheduling
- PR/22 Change Management (POWRA)
- PR/40 Induction
- PR/64 Roles & Responsibilities
- CPP
- WPP
- TBS
- Modern Slavery
- PR/08 Work At Height Permit
- PR/08 Permit to Dig
- PR/08 Confined Spaces Permit
- PR/08 Hot Works Permit
- PR/08 Permit to Lift
- PR/08 Electrical Permit
- PR/08 General permit to work
- Resources
- Other - Please provide detail in notes
-
Select 'Quality' Major concern/s
- Product
- Workmanship
- TQ
- Service
- Snagging
- QA Checks
- Other: Please provide details in notes
-
Select 'SSOW' Major concern/s
- SSOW
- Trains
- OTP
- ALO
- Runaway Risk
- Sentinel
- Other - please provide details in notes
-
RTS HSQS Tour
Classifications:
Major concern/s:
- There is instruction on risk control measures for the Worker / Supervisor / Manager in the planning documentation but there is no attempt to control the risk e.g. TBS states the risk control measures for plant use but worker/s not adhering to the risk controls e.g. using a digger with no exclusion zones in place.
- There is no identification of risk + control measures detailed within the planning documentation and the worker / supervisor / manager has made no attempt to control the risk. e.g. TBS does not detail the risk or controls and the worker is not making attempts to control the risk.
Improvement areas:
- There has been partial attempt to to control the risk but can be improved. documentation contains control measures for the risk but can be improved.
Good Practice or as expected:
- Control measures suitable and sufficient and aligns with the planning documentation.
Planning Documentation = TBS / WPP / CPP / Permit / RTS IMS procedures / RTS minimum standards / RAMS / Induction etc.
Sub-Contractor / Supplier Work (PR/19) - (Select 'No' if not applicable).
-
Are you observing Sub-Contractor / Supplier Work?
-
Consider the following hazards / subjects / areas: Height, Lifting Operations, Buried Services & excavations, Plant & fleet, SSOW, confined spaces, COSHH, Drugs & Alcohol, Electricity, emergency preparedness & Fire, Musculoskeletal, Noise, Respiratory, Vibration, Welfare, Temporary Works, 'Individual', 'Job', 'Organising', Environment & sustainability & Quality
-
Any Good Practice/s?
-
Select the Good Practice/s - can be multiple
- Height
- Lifting Operations
- Buried Services & Excavations
- Plant & Fleet
- PR/59 Safe System of Work (SSOW) - (Trains, OTP, ALO, Runaway Risk, Sentinel)
- Confined Spaces
- COSHH
- Drugs & Alcohol
- Electricity
- Emergency Preparedness & Fire
- Musculoskeletal
- Noise
- Respiratory
- Vibration
- Welfare
- PR/60 Temporary Works
- Individual: Attitude, behaviour, capabilities, communication, health, well being
- Job: Access & egress, housekeeping, layout, materials, tools & equipment, PPE, work environment, site set-up, workload
- Organisation: communication, competence management, culture, design, documentation, monitoring, procedure, project management, resourcing, risk assessment, supervision, change management, Induction, work scheduling, Permits
- PR/29 Environment and Sustainability
- Quality - product, service, workmanship, TQ
- Other - Please provide detail in notes
-
Select 'Individual' Good Practice - can be multiple
- PR/37 Attitude
- PR/37 behaviour
- PR/26 Capabilities
- PR/06 Communication
- PR/52 Health
- PR/52 Well Being
- PR/01 Fatigue
- Other - Please provide detail in notes
-
Select 'Job' good Practice
- PR/51 Access & Egress
- PR/51 Housekeeping
- PR/51 Layout
- PR/64 Materials
- PR/12 Plant, Tools & Equipment
- PR/17 PPE
- PR/51 Work Environment
- PR/51 Site set-up
- PR/52 Workload
- PR/51 Signage & signals
- PR/51 Site security, Trespass & Public Interface
- PR/51 Lineside Materials
- Other - Please provide detail in notes
-
Select 'Organisation' Good Practice
- PR/06 Communication, Briefing and Coordination
- PR/26 Competence Management
- PR/37 Culture
- PR/11 Design
- PR/64 documentation
- PR/45 monitoring
- PR/19 Contractor Management
- PR/08 procedure
- project management
- PR/19 resourcing (supplier)
- PR/08 risk assessment
- PR/51 supervision
- work scheduling
- PR/22 Change Management (POWRA)
- PR/40 Induction
- PR/64 Roles & Responsibilities
- CPP
- WPP
- TBS
- Modern Slavery
- PR/08 Work At Height Permit
- PR/08 Permit to Dig
- PR/08 Confined Spaces Permit
- PR/08 Hot Works Permit
- PR/08 Permit to Lift
- PR/08 Electrical Permit
- PR/08 General permit to work
- Resources
- Other - Please provide detail in notes
-
Select 'Quality' Good Practice
- Product
- Workmanship
- TQ
- Service
- Snagging
- QA Checks
- Other: Please provide details in notes
-
Select 'SSOW' Good Practice
- SSOW
- Trains
- OTP
- ALO
- Runaway Risk
- Sentinel
- Other - please provide details in notes
-
Any risk control/s to Improve?
-
Select the risk controls to improve? - can be multiple
- Height
- Lifting Operations
- Buried Services & Excavations
- Plant & Fleet
- PR/59 Safe System of Work (SSOW) - (Trains, OTP, ALO, Runaway Risk, Sentinel)
- Confined Spaces
- COSHH
- Drugs & Alcohol
- Electricity
- Emergency Preparedness & Fire
- Musculoskeletal
- Noise
- Respiratory
- Vibration
- Welfare
- PR/60 Temporary Works
- Individual: Attitude, behaviour, capabilities, communication, health, well being
- Job: Access & egress, housekeeping, layout, materials, tools & equipment, PPE, work environment, site set-up, workload
- Organisation: communication, competence management, culture, design, documentation, monitoring, procedure, project management, resourcing, risk assessment, supervision, change management, Induction, work scheduling, Permits
- PR/29 Environment and Sustainability
- Quality - product, service, workmanship, TQ
- Other - Please provide detail in notes
-
Select 'Individual' Improvement/s- can be multiple
- PR/37 Attitude
- PR/37 behaviour
- PR/26 Capabilities
- PR/06 Communication
- PR/52 Health
- PR/52 Well Being
- PR/01 Fatigue
- Other - Please provide detail in notes
-
Select 'Job' Improvement/s- can be multiple
- PR/51 Access & Egress
- PR/51 Housekeeping
- PR/51 Layout
- PR/64 Materials
- PR/12 Plant, Tools & Equipment
- PR/17 PPE
- PR/51 Work Environment
- PR/51 Site set-up
- PR/52 Workload
- PR/51 Signage & signals
- PR/51 Site security, Trespass & Public Interface
- PR/51 Lineside Materials
- Other - Please provide detail in notes
-
Select 'Organisation' Improvement/s
- PR/06 Communication, Briefing and Coordination
- PR/26 Competence Management
- PR/37 Culture
- PR/11 Design
- PR/64 documentation
- PR/45 monitoring
- PR/19 Contractor Management
- PR/08 procedure
- project management
- PR/19 resourcing (supplier)
- PR/08 risk assessment
- PR/51 supervision
- work scheduling
- PR/22 Change Management (POWRA)
- PR/40 Induction
- PR/64 Roles & Responsibilities
- CPP
- WPP
- TBS
- Modern Slavery
- PR/08 Work At Height Permit
- PR/08 Permit to Dig
- PR/08 Confined Spaces Permit
- PR/08 Hot Works Permit
- PR/08 Permit to Lift
- PR/08 Electrical Permit
- PR/08 General permit to work
- Resources
- Other - Please provide detail in notes
-
Select 'Quality' Improvement/s
- Product
- Workmanship
- TQ
- Service
- Snagging
- QA Checks
- Other: Please provide details in notes
-
Select 'SSOW' Improvement/s
- SSOW
- Trains
- OTP
- ALO
- Runaway Risk
- Sentinel
- Other - please provide details in notes
-
Any major concerns with any risk control/s?
-
Select the major concern/s - can be multiple
- Height
- Lifting Operations
- Buried Services & Excavations
- Plant & Fleet
- PR/59 Safe System of Work (SSOW) - (Trains, OTP, ALO, Runaway Risk, Sentinel)
- Confined Spaces
- COSHH
- Drugs & Alcohol
- Electricity
- Emergency Preparedness & Fire
- Musculoskeletal
- Noise
- Respiratory
- Vibration
- Welfare
- PR/60 Temporary Works
- Individual: Attitude, behaviour, capabilities, communication, health, well being
- Job: Access & egress, housekeeping, layout, materials, tools & equipment, PPE, work environment, site set-up, workload
- Organisation: communication, competence management, culture, design, documentation, monitoring, procedure, project management, resourcing, risk assessment, supervision, change management, Induction, work scheduling, Permits
- PR/29 Environment and Sustainability
- Quality - product, service, workmanship, TQ
- Other - Please provide detail in notes
-
Select 'Individual' Major concern/s- can be multiple
- PR/37 Attitude
- PR/37 behaviour
- PR/26 Capabilities
- PR/06 Communication
- PR/52 Health
- PR/52 Well Being
- PR/01 Fatigue
- Other - Please provide detail in notes
-
Select 'Job' ' Major concern/s- can be multiple
- PR/51 Access & Egress
- PR/51 Housekeeping
- PR/51 Layout
- PR/64 Materials
- PR/12 Plant, Tools & Equipment
- PR/17 PPE
- PR/51 Work Environment
- PR/51 Site set-up
- PR/52 Workload
- PR/51 Signage & signals
- PR/51 Site security, Trespass & Public Interface
- PR/51 Lineside Materials
- Other - Please provide detail in notes
-
Select 'Organisation' Major concern/s
- PR/06 Communication, Briefing and Coordination
- PR/26 Competence Management
- PR/37 Culture
- PR/11 Design
- PR/64 documentation
- PR/45 monitoring
- PR/19 Contractor Management
- PR/08 procedure
- project management
- PR/19 resourcing (supplier)
- PR/08 risk assessment
- PR/51 supervision
- work scheduling
- PR/22 Change Management (POWRA)
- PR/40 Induction
- PR/64 Roles & Responsibilities
- CPP
- WPP
- TBS
- Modern Slavery
- PR/08 Work At Height Permit
- PR/08 Permit to Dig
- PR/08 Confined Spaces Permit
- PR/08 Hot Works Permit
- PR/08 Permit to Lift
- PR/08 Electrical Permit
- PR/08 General permit to work
- Resources
- Other - Please provide detail in notes
-
Select 'Quality' Major concern/s
- Product
- Workmanship
- TQ
- Service
- Snagging
- QA Checks
- Other: Please provide details in notes
-
Select 'SSOW' Major concern/s
- SSOW
- Trains
- OTP
- ALO
- Runaway Risk
- Sentinel
- Other - please provide details in notes
-
Sub-Contractor / Supplier HSQS Tour
Classifications:
Major concern/s:
- There is instruction on risk control measures for the Worker / Supervisor / Manager in the planning documentation but there is no attempt to control the risk e.g. TBS states the risk control measures for plant use but worker/s not adhering to the risk controls e.g. using a digger with no exclusion zones in place.
- There is no identification of risk + control measures detailed within the planning documentation and the worker / supervisor / manager has made no attempt to control the risk. e.g. TBS does not detail the risk or controls and the worker is not making attempts to control the risk.
Improvement areas:
- There has been partial attempt to to control the risk but can be improved. documentation contains control measures for the risk but can be improved.
Good Practice or as expected:
- Control measures suitable and sufficient and aligns with the planning documentation.
Planning Documentation = TBS / WPP / CPP / Permit / RTS IMS procedures / RTS minimum standards / RAMS / Induction etc. -
Sub-Contractor / Supplier Name
-
Product or Service Provided
Summary
-
Any OFIs? - An opportunity that may be used to improve the business system. - if ' yes' add note to provide detail/s
-
Safety conversations, consultation or discussions and/or guidance / training
-
Any accidents or Incidents? if ' yes' add note to provide detail/s
-
Any close call/s? if ' yes', scan the QR code and submit.
-
Any competence problems or other support needed? if ' yes' add note to provide detail/s
-
Any candidates for the QSS award? - enter name if applicable
-
Auditor's signature
-
Auditee's signature (site representative agreeing content of the report)
-
Notes. Severity of noncompliance & definitions:
Major concerns- correct within 24 hours
Improvement within 7 days
OFI - Opportunity for improvement. An opportunity that may be used to improve the business system.