Summary
-
Site conducted
-
Conducted on
-
Prepared by
-
Customer address
Customer Pre install Checklist
-
Can the Installation be completed
-
The Engineer Pre-Called/Messaged Me Before Arrival
-
The Engineer Confirmed His Name And Showed Me His ID
-
The Engineer Confirmed What He Was Going To Do Before<br>Any Work Started
-
Are You Over 18
-
The Engineer Told Me The Best Location For My Router
-
If A Location Other Than The One Proposed By The Engineer<br>Is To Be Used, Please Confirm You Are Happy With This
-
Please Sign To Confirm You Are Happy For Your Installation To Commence
-
Why
- Cherry Picker required
- Customer no show
- Reschedule
- Survey required
- Wrong premises type
- Planning issue
- Customer cancellation
- Missed by crew
- Drilling permission required
-
Please add pics
Post install checklist (Customer)
-
Specify the type of install
-
Take photo of the complete ASN showing all your work inside and the power reading
-
Take photo of the ASN closed and properly supported
-
Take photo of the bracket on eves or duct exit point for UG
-
Take photo of external cable route
-
Take photo of external entry hole
-
Take photo of external csp with fibre wrapping
-
Take a photo of the external hole (Fire sealed/sealant)
-
Take photo of internal cable run
-
Has The Engineer Shown You The Router Working
-
Take photo of the label on the back of the ONT
-
Take photo of the label on the back of the router
-
Take a photo of the router location (Wide angle)
-
Are You Happy With How Our Engineer Has Left Your<br>Property
-
If You Have Any Comments For Us Please Add Them Here
-
Are you happy with the new router location
-
Please Sign To Confirm You Are Happy With All Work Completed
-
Take photo of the complete Node showing all your work inside and the power reading
- Cherry Picker required
- Customer no show
- Reschedule
- Survey required
- Wrong premises type
- Planning issue
- Customer cancellation
- Missed by crew
- Drilling permission required
-
Take photo of the node closed and properly supported
-
Take a photo of the node clearly showing Labels
-
Take photo of the bracket on eves or duct exit point for UG
-
Take photo of external cable route
-
Take photo of external entry hole
-
Take photo of external csp with fibre wrapping
-
Take a photo of the external hole (Fire sealed/sealant)cd
-
Take a photo of the label on the back of the router
-
Take a photo of the label on the back of the ONT
-
Take a photo of the external csp (POE) with fibre wrapping
-
Take a photo of the entry hole
-
Take a photo of the fire stopping used
-
Take a photo of the fire stopping label
-
Take a photo of the internal wiring
-
Take a photo of the label on the back of the router
-
Take a photo of the label on the back of the ONT
-
Take a photo of the router location (Wide angle view)
-
Are You Happy With The Quality Of The Cabling
-
Did The Engineer Explain Everything They Have Done
-
Are You Happy With How Our Engineer Has Left Your<br>Property
-
Are you happy with the new router location
-
Please Sign To Confirm You Are Happy With All Work Completed
Post install Checklist Engineer
-
Did The Engineer Wear Overshoes
-
Are you happy with the new router location
-
Did The Engineer Explain Everything They Have Done
-
Has The Engineer Shown You The Router Working
-
Are You Happy With How Our Engineer Has Left Your<br>Property
-
Are You Happy With The Quality Of The Cabling
-
If You Have Any Comments For Us Please Add Them Here
-
Please Sign To Confirm You Are Happy With All Work Completed