Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

  • Add location
  • Add media

FOUNDATIONS

  • Check setting out and House type , Reduced levels and DPC height

  • Excavation width and depths --- Building Inspector approval

  • Concrete mixes , strength and quantity

  • Concrete level and thickness

  • Photos if required

  • Notes

Bricklayer

  • Check cleanliness of excavation

  • Check line and level of proposed foundations

  • Check Brick and Block type

  • Check quality of work ---- line and level and bonding

  • Check provision of drainage lintels and service positions

  • Photos if required

  • Notes

Concreter

  • Check cavities are filled to correct level

  • Check ducts and internal drainage are correctly positioned

  • Check depth of fill to sub floor

  • Check DPC under floor membranes are correctly positioned

  • Check reinforcement , if applicable , is correctly placed

  • Check concrete mixes and strengths Note quantity and slump<br>

  • Check concrete level , thickness and finish

  • Notes

  • Photos if required

Brickwork to DPC

  • Check engineering to dpc, correct strength of mortar used<br>

  • check cavities are filled to correct level

  • Photos if required

  • Notes

Drain layer

  • Check correct position of manholes and inspection chambers <br>

  • Check inverts to chambers

  • Check all pipes are laid to correct falls

  • Check all pipes have adequate cover with bedding or concrete<br>

  • Check all pipes are tested and left clean<br>

  • Check excavations are backfilled and compacted<br>

  • Check all surplus materials are removed

  • Check manholes --- open ends are sealed and left clean

  • Notes

  • Photos if required

Brickwork

  • Check current drawings are in circulation<br>

  • What is the current drawing number and date you are using?

  • Check positioning of vertical and horizontal DPC<br>

  • Check positioning of wall and frame ties<br>

  • Check cavity insulation is in place correctly<br>

  • Check brickwork for plumbness and level<br>

  • Check position of door and window openings<br>

  • Check accuracy cleanliness and bonding <br>

  • Check position of service boxes<br>

  • Check correct lintels have been used<br>

  • Check storey heights<br>

  • Check construction of chimneys and flues if applicable<br>

  • Check overall quality<br>

  • Check cavity trays & weep holes are correct<br>

  • Photos if required

  • Notes

Artstone

  • Check cavity tray is above & below artstone head & weeps in place<br>

  • Check artstone protection is in place<br>

  • Photos if required

  • Notes

Joists

  • Check current drawings are in circulation<br>

  • What is the current drawing number and date you are using?

  • Check for line and level ---- Check bearing on walls<br>

  • Check trimming and provision for services<br>

  • Ensure all hangers are fully nailed and trimmers are bolted<br>

  • Check position of galvanised straps <br>

  • Check stairwell opening<br>

  • Check storey height<br>

  • Ensure joist ends are securely built into blockwork and mastic sealed around joists<br>

  • Photos if required

  • Notes

Roof Timbers

  • Check material being used<br>

  • Check all timber is securely fixed or bolted<br>

  • Check trusses for centres and plumbness<br>

  • Check amount and position of wind bracing and nailing<br>

  • Check details of Dormers, eaves, verges, purlins etc if applicable<br>

  • Check fascia and boxes properly constructed and fixed <br>

  • Check soffits are constructed correctly and check venting<br>

  • Check storey height<br>

  • Photos if required

  • Notes

Roof Tiling

  • Check laps to felt<br>

  • Check nailing to tiles in accordance with manufacturers guidelines<br>

  • Check Dry Ridge System is being installed<br>

  • Photos if required

  • Notes

1st fix Plumbing and Heating

  • Check customer extras if applicable<br>

  • Check fixing of pipework<br>

  • Check position of gas points<br>

  • Check fixing of surface pipework<br>

  • Check no pipes have been notched in floor joists<br>

  • Check radiator sizes tie up with carcasing<br>

  • Check for damage to other work<br>

  • Photos if required

  • Notes

Carpenter 1st fix

  • Check current drawings are in circulation<br>

  • What is the current drawing number and date you are using?

  • Check flooring is glued & securely fixed (annular ring or screwed)<br>

  • Check plumbness, squareness and position of stud walls<br>

  • Check customers extras if applicable<br>

  • Check fixing of door linings, window boards and flooring<br>

  • Check fixing and protection of stairs<br>

  • Check all linings are square, plumb and in wind<br>

  • Check completion of works and clear out<br>

  • Photos if required

  • Notes

Electrical 1st fix

  • Check current drawings are in circulation<br>

  • What is the current drawing number and date you are using?

  • Check customers extras if applicable<br>

  • Check route of cables through joists<br>

  • Check wiring is correct<br>

  • Check for damage to other work and cleanliness <br>

  • Check general layout of lights, switches and sockets<br>

  • Photos if required

  • Notes

Dry Lining

  • Check current drawings are in circulation<br>

  • What is the current drawing number and date you are using?

  • Check amount of dabbing applied per sheet<br>

  • Check perimeter solid sealing<br>

  • Check alignment of sheets with one another<br>

  • Check squareness of reveals<br>

  • Check neatness of joints<br>

  • Check tapes are not cut to short and are covered with finish<br>

  • Check for bumps in walls<br>

  • Check all electrical boxes are exposed properly<br>

  • Check damage to other trades work<br>

  • Check cleanliness on completion<br>

  • Photos if required

  • Notes

Carpenter 2nd fix

  • Check customers extras if applicable<br>

  • Check fitment and fixing of skirtings and backmoulds<br>

  • Check hanging and fit of doors<br>

  • Check ironmongery used and action of same<br>

  • Check fitment and fixing of kitchen units and sink top<br>

  • Check general fixings used and quality of workmanship<br>

  • Check for correct colour of kitchen units and worktops<br>

  • Check protection to kitchen units and worktops is in place<br>

  • Check all nails are punched home<br>

  • Check all works are complete<br>

  • Check cleanliness on completion<br>

  • Check for damage to other trades<br>

  • Photos if required

  • Notes

Plumber 2nd fix

  • Check current drawings are in circulation<br>

  • What is the current drawing number and date you are using?

  • Check customers extras if applicable<br>

  • Check plumbness of pipes<br>

  • Check fixing of pipes<br>

  • Check position of radiators<br>

  • Check general plumbing in of sanitary ware (supports under bath legs, fixing of pedastles etc )<br>

  • Check for drain offs and stop cocks to cylinder, sink unit and boiler<br>

  • Check for damage to other trades<br>

  • Check for cleanliness on completion<br>

  • Photos if required

  • Notes

Electrical 2nd fix

  • Check current drawings are in circulation<br>

  • What is the current drawing number and date you are using?

  • Check for customers extras if applicable<br>

  • Check position of fitments<br>

  • Check levelness of sockets<br>

  • Check fixing to sockets and pendants<br>

  • Check earthing of sink units, bath radiators and gas main<br>

  • Check boiler installation<br>

  • Check bonding is connected<br>

  • Check tails of meter cupboards<br>

  • Photos if required

  • Notes

Pre Wall & Floor Tiling

  • All pipe boxings complete<br>

  • Bath & shower trays in place<br>

  • Vanity units dry fit<br>

  • Sanitary wares dry fit<br>

  • Moisture resistant board in shower area<br>

  • Concealed shower mixer control suitably recessed<br>

  • Photos if required

  • Notes

Post Wall & Floor Tiling

  • All tiles flush & neatly grouted<br>

  • All mitres to borders machine finished<br>

  • All edging strips neatly fixed and jointed<br>

  • All tiles neatly polished off<br>

  • Photos if required

  • Notes

Painting

  • Check preparation, rubbing down, filling and removal of dust<br>

  • Check number of coats applied<br>

  • Check for lack of viscosity<br>

  • Check cutting in to skirtings, backmoulds and frames<br>

  • Check brush finish to doors <br>

  • Check general quality to all surface finishes and cleanliness<br>

  • Notes

Gas Appliances

  • Check all appliances have been fully tested and all Instruction Manuals are available for home owners manual<br>

  • Notes

Post Habitation

  • Check customers extras have been complied with if applicable<br>

  • Check external is complete as per Fam vis form<br>

  • Check general cleanliness of sanitary wares, Windows,<br>

  • Kitchen units and all Floors<br>

  • Ensure heat test has been carried out<br>

  • Check internal mastic has been applied cleanly and correctly<br>

  • Check action of all door furniture<br>

  • Check all wastes are installed and working<br>

  • Check insulation is correctly in place in loft and correct depth<br>

  • Check all panels to sanitary wares are secure<br>

  • Check all keys fit respective locks<br>

  • Notes

  • Photos if required

  • Add a Drawing if required

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.