Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
-
Add media
FOUNDATIONS
-
Check setting out and House type , Reduced levels and DPC height
-
Excavation width and depths --- Building Inspector approval
-
Concrete mixes , strength and quantity
-
Concrete level and thickness
-
Photos if required
-
Notes
Bricklayer
-
Check cleanliness of excavation
-
Check line and level of proposed foundations
-
Check Brick and Block type
-
Check quality of work ---- line and level and bonding
-
Check provision of drainage lintels and service positions
-
Photos if required
-
Notes
Concreter
-
Check cavities are filled to correct level
-
Check ducts and internal drainage are correctly positioned
-
Check depth of fill to sub floor
-
Check DPC under floor membranes are correctly positioned
-
Check reinforcement , if applicable , is correctly placed
-
Check concrete mixes and strengths Note quantity and slump<br>
-
Check concrete level , thickness and finish
-
Notes
-
Photos if required
Brickwork to DPC
-
Check engineering to dpc, correct strength of mortar used<br>
-
check cavities are filled to correct level
-
Photos if required
-
Notes
Drain layer
-
Check correct position of manholes and inspection chambers <br>
-
Check inverts to chambers
-
Check all pipes are laid to correct falls
-
Check all pipes have adequate cover with bedding or concrete<br>
-
Check all pipes are tested and left clean<br>
-
Check excavations are backfilled and compacted<br>
-
Check all surplus materials are removed
-
Check manholes --- open ends are sealed and left clean
-
Notes
-
Photos if required
Brickwork
-
Check current drawings are in circulation<br>
-
What is the current drawing number and date you are using?
-
Check positioning of vertical and horizontal DPC<br>
-
Check positioning of wall and frame ties<br>
-
Check cavity insulation is in place correctly<br>
-
Check brickwork for plumbness and level<br>
-
Check position of door and window openings<br>
-
Check accuracy cleanliness and bonding <br>
-
Check position of service boxes<br>
-
Check correct lintels have been used<br>
-
Check storey heights<br>
-
Check construction of chimneys and flues if applicable<br>
-
Check overall quality<br>
-
Check cavity trays & weep holes are correct<br>
-
Photos if required
-
Notes
Artstone
-
Check cavity tray is above & below artstone head & weeps in place<br>
-
Check artstone protection is in place<br>
-
Photos if required
-
Notes
Joists
-
Check current drawings are in circulation<br>
-
What is the current drawing number and date you are using?
-
Check for line and level ---- Check bearing on walls<br>
-
Check trimming and provision for services<br>
-
Ensure all hangers are fully nailed and trimmers are bolted<br>
-
Check position of galvanised straps <br>
-
Check stairwell opening<br>
-
Check storey height<br>
-
Ensure joist ends are securely built into blockwork and mastic sealed around joists<br>
-
Photos if required
-
Notes
Roof Timbers
-
Check material being used<br>
-
Check all timber is securely fixed or bolted<br>
-
Check trusses for centres and plumbness<br>
-
Check amount and position of wind bracing and nailing<br>
-
Check details of Dormers, eaves, verges, purlins etc if applicable<br>
-
Check fascia and boxes properly constructed and fixed <br>
-
Check soffits are constructed correctly and check venting<br>
-
Check storey height<br>
-
Photos if required
-
Notes
Roof Tiling
-
Check laps to felt<br>
-
Check nailing to tiles in accordance with manufacturers guidelines<br>
-
Check Dry Ridge System is being installed<br>
-
Photos if required
-
Notes
1st fix Plumbing and Heating
-
Check customer extras if applicable<br>
-
Check fixing of pipework<br>
-
Check position of gas points<br>
-
Check fixing of surface pipework<br>
-
Check no pipes have been notched in floor joists<br>
-
Check radiator sizes tie up with carcasing<br>
-
Check for damage to other work<br>
-
Photos if required
-
Notes
Carpenter 1st fix
-
Check current drawings are in circulation<br>
-
What is the current drawing number and date you are using?
-
Check flooring is glued & securely fixed (annular ring or screwed)<br>
-
Check plumbness, squareness and position of stud walls<br>
-
Check customers extras if applicable<br>
-
Check fixing of door linings, window boards and flooring<br>
-
Check fixing and protection of stairs<br>
-
Check all linings are square, plumb and in wind<br>
-
Check completion of works and clear out<br>
-
Photos if required
-
Notes
Electrical 1st fix
-
Check current drawings are in circulation<br>
-
What is the current drawing number and date you are using?
-
Check customers extras if applicable<br>
-
Check route of cables through joists<br>
-
Check wiring is correct<br>
-
Check for damage to other work and cleanliness <br>
-
Check general layout of lights, switches and sockets<br>
-
Photos if required
-
Notes
Dry Lining
-
Check current drawings are in circulation<br>
-
What is the current drawing number and date you are using?
-
Check amount of dabbing applied per sheet<br>
-
Check perimeter solid sealing<br>
-
Check alignment of sheets with one another<br>
-
Check squareness of reveals<br>
-
Check neatness of joints<br>
-
Check tapes are not cut to short and are covered with finish<br>
-
Check for bumps in walls<br>
-
Check all electrical boxes are exposed properly<br>
-
Check damage to other trades work<br>
-
Check cleanliness on completion<br>
-
Photos if required
-
Notes
Carpenter 2nd fix
-
Check customers extras if applicable<br>
-
Check fitment and fixing of skirtings and backmoulds<br>
-
Check hanging and fit of doors<br>
-
Check ironmongery used and action of same<br>
-
Check fitment and fixing of kitchen units and sink top<br>
-
Check general fixings used and quality of workmanship<br>
-
Check for correct colour of kitchen units and worktops<br>
-
Check protection to kitchen units and worktops is in place<br>
-
Check all nails are punched home<br>
-
Check all works are complete<br>
-
Check cleanliness on completion<br>
-
Check for damage to other trades<br>
-
Photos if required
-
Notes
Plumber 2nd fix
-
Check current drawings are in circulation<br>
-
What is the current drawing number and date you are using?
-
Check customers extras if applicable<br>
-
Check plumbness of pipes<br>
-
Check fixing of pipes<br>
-
Check position of radiators<br>
-
Check general plumbing in of sanitary ware (supports under bath legs, fixing of pedastles etc )<br>
-
Check for drain offs and stop cocks to cylinder, sink unit and boiler<br>
-
Check for damage to other trades<br>
-
Check for cleanliness on completion<br>
-
Photos if required
-
Notes
Electrical 2nd fix
-
Check current drawings are in circulation<br>
-
What is the current drawing number and date you are using?
-
Check for customers extras if applicable<br>
-
Check position of fitments<br>
-
Check levelness of sockets<br>
-
Check fixing to sockets and pendants<br>
-
Check earthing of sink units, bath radiators and gas main<br>
-
Check boiler installation<br>
-
Check bonding is connected<br>
-
Check tails of meter cupboards<br>
-
Photos if required
-
Notes
Pre Wall & Floor Tiling
-
All pipe boxings complete<br>
-
Bath & shower trays in place<br>
-
Vanity units dry fit<br>
-
Sanitary wares dry fit<br>
-
Moisture resistant board in shower area<br>
-
Concealed shower mixer control suitably recessed<br>
-
Photos if required
-
Notes
Post Wall & Floor Tiling
-
All tiles flush & neatly grouted<br>
-
All mitres to borders machine finished<br>
-
All edging strips neatly fixed and jointed<br>
-
All tiles neatly polished off<br>
-
Photos if required
-
Notes
Painting
-
Check preparation, rubbing down, filling and removal of dust<br>
-
Check number of coats applied<br>
-
Check for lack of viscosity<br>
-
Check cutting in to skirtings, backmoulds and frames<br>
-
Check brush finish to doors <br>
-
Check general quality to all surface finishes and cleanliness<br>
-
Notes
Gas Appliances
-
Check all appliances have been fully tested and all Instruction Manuals are available for home owners manual<br>
-
Notes
Post Habitation
-
Check customers extras have been complied with if applicable<br>
-
Check external is complete as per Fam vis form<br>
-
Check general cleanliness of sanitary wares, Windows,<br>
-
Kitchen units and all Floors<br>
-
Ensure heat test has been carried out<br>
-
Check internal mastic has been applied cleanly and correctly<br>
-
Check action of all door furniture<br>
-
Check all wastes are installed and working<br>
-
Check insulation is correctly in place in loft and correct depth<br>
-
Check all panels to sanitary wares are secure<br>
-
Check all keys fit respective locks<br>
-
Notes
-
Photos if required
-
Add a Drawing if required
-
Signature