Information
-
Customer Name & Address
-
Number of units
-
No: of Floors
-
System Type
-
Headend Location
-
Engineer Name
-
Date
-
Inspected by
Job progression
-
Time arrived on site
-
Can a DCSS plug in adaptor be fitted?
-
Main reason(s) for NOT being able to fit a plug in adaptor. If several reasons apply please add additional notes in comments section.
- Existing System not earthed
- Signal levels on existing system out of specification
- Single feed IRS (Not Powered)
- No space in Riser/Cab to fit DCSS
- MA would not agree to install
- No Access to riser or cabinet
- 9 Wire IRS (Not compatible)
- DSCR already present and can be utilised
- Customer not aware of obligation to arrange access to Headend
- No communal system
- Customer already had an existing mini dish
-
Additional Comments
-
Add media
-
What Action was taken?
- Job Cancelled
- Mini dish installed for Q
- Job completed with existing DSCR
- Rebooked for MA permission
- Same day Res (Sky HD installed)
-
Additional Comments
-
Time left site
-
Total time on site
Pre Install
-
Pre Install checks with customer
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Locating and Accessing Head-end
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Confirm Earthing
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Signal checks on existing system
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Confirm Power options
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Additional notes
DCSS Adaptor Install
-
Toning of Cables
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Fitting of DCSS adaptor
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Signal check (from DCSS)
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Reconnection of cables / customer feeds
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Power DCSS (If PSU)
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Additional notes
Q Install
-
Install Q box
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Power (If Power inserter)
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Set up Procedure
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Other boxes if applicable
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Customer Demo / Showcase
- 1 Min
- 5 Mins
- 10 Mins
- 15 Mins
- 20 Mins
- 25 Mins
- 30 Mins
- Other
-
How long?
-
Additional notes
Conclusion
-
Time left site
-
Total time to complete DCSS adaptor
-
Total time to complete entire install
-
Additional notes
Walk off photos
-
Scan barcode of DCSS adaptor used
-
Photo of existing Head-end
-
Earthing photo
-
Data log photo (existing) with H/E in background
-
Post Install photo (H/E & DCSS)
-
DCSS photo (close up of DCSS showing cables labelled etc)
-
Data log photo (DCSS) with H/E in background
-
Any possible installation improvements (I.E - MDF boards, cabinets, longer connection cables etc)
-
Additional Notes
-
Please add any additional stock items used (NOT SKY SUPPLIED)
-
Future proof concerns