Title Page

  • Project Number

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Our Contract is with:

  • Contact Name:

  • Contact Number:

  • General Contractor Superintendent

  • GC Superintendents Mobile Number

Section 1

Safety

  • Is there an onsite safety orientation?

  • Duration of orientation in hours

  • Is there a guardrail (provided by others) in place?

  • What type of fall protection system will be used?

  • Will the top rail be at an acceptable height after we perform our scope of work?

  • What type of fall protection system will be used?

Project Information

  • How many trips will this project take to complete?

  • What percent of the project is ready now?

  • What type of project is this?

Site Conditions

  • Where will the pump be set up?

  • Will tarps/plastic be needed to protect asphalt/concrete?

  • Picture of Setup Area

  • Setup area description

  • Will we need to bring a water tank/pump?

  • Picture of Water Supply

  • Water supply description

  • Do we need to bring pump-out barrels?

  • Pump out area description

  • Picture of pump out area

Roof Deck Conditions

  • What structural substrate will we be pouring on?

  • Is the metal deck galvanized?

  • Is the metal deck vented?

  • Take a picture of the vented deck

  • Is it a structural slab or precast double T's?

  • Do the joints need to be filled by WFP?

  • Are all the curbs and penetrations installed?

  • Are the curbs and penetrations in the correct location?

  • Are all the roof drains/scuppers installed?

  • Are the roof drains/suppers at the correct elevation?

  • Is the gutter edge detail complete?

  • Are the parapet walls framed?

  • Are the parapet walls sheathed?

  • Picture of Roof Access

  • Roof Access description

  • What is the structural framing material?

  • Is the structural framing complete?

  • Is the perimeter angle installed?

  • Are the ridge/valley plates installed?

Building Condition

  • What substrate will we be pouring on?

  • Is the substrate tight and penetrations sealed?

  • Will WFP be installing sound mat on this project?

  • Are there bulkheads at the transitions?

  • Is WFP installing the bulkheads?

  • The GC has be notified about cleanliness, ventilation, and cure times.

Building Condition

  • How many runs of track/panels?

  • What type of project is this?

  • Has electrician has been notified about WFP's requirements/expectations?

  • Has the area/room been reserved for the scheduled date of repairs?

  • Do we have work above ground floor?

  • How are we getting materials to elevated floors?

  • Who is providing the hoisting?

  • Describe access

  • Picture of access

  • Describe access

  • Picture of access

Project Pictures

  • Other pictures

Signature

  • Completed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.