Title Page
-
Conducted on
-
Prepared by
-
Location
Plumbing Stub outs present and braced
-
Guest 3rd Floor
-
Laundry room
-
Kitchen
-
Guest 2nd floor
-
Guest 1st floor
-
Water heater closet
-
Master bathroom
-
Especial notes
Electrical, HVAC and Framing
-
Ceiling lights correct and marked
-
Light whips at present and at proper location
-
Outlets and switches present and marked
-
HVAC present and marked
-
Framing blocking, soffits correct
-
Stairs handrail blocking installed
-
Cabinets blocking installed
-
Extra blocking (E.G. Shower benches, grab bars, etc) requested and installed
-
Door openings checked and marked on frame
-
Nail plates for plumbing and electrical installed
-
Firestop
-
Fire suppression sprinkler heads present and protected
-
Especial notes
General Job-Site Conditions and Safety
-
Job site clean, floors free of debris
-
Temporary bracing, framing, walking and supporting structures removed
-
Envelope penetrations done for temporary purposes have been covered, patched and sealed properly?
-
Plumbing, Electrical, HVAC and framing excess material removed from unit?
-
Falling protection in place, elevator shafts, balconies and window openings rails installed?
-
Any damages to framing, windows, doors or building envelope during drywall load up
-
Special notes
-
Upload pictures for any concerns