Title Page

  • Site

  • Conducted on

  • Prepared by

  • Location

General

  • Who is the current energy supplier?

  • Please provide building Images

Electricity Metering

  • Proposed metering option for main incomer

  • Please provide image of incoming meter point and reading

  • Proposed sub-metering option

  • Number of distribution boards (please attach images)

  • Identify circuit types that can be grouped (i.e. lighting & small power)

  • Identify circuit types that must be metered separately (i.e. large equipment)

  • Please provide schematic layout of your metering proposal

  • Total number of meters required

  • Total number of CTs required

  • Does the building have solar PV?

  • Number of meters required

  • Does the building have battery storage?

  • Number of meters required?

  • Does the building have EV charging?

  • Number of meters required?

Gas Metering

  • Does the building have a gas supply?

  • Proposed metering option for main incomer

  • Please provide image of incoming meter point and reading

Heat Metering

  • Heating system type

  • Manufacturer

  • Serial Number

  • Are there any existing sensors meters in place?

Gateways

  • Client preference for connectivity?

Installation

  • Estimated hours for system installation

  • Other considerations

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.