Title Page

  • Site conducted

  • Townhouse number

  • Conducted on

  • Prepared by

  • Location

Untitled Page

Ground Floor

electrical

  • roughin complete

Plumbing

  • rough in complete

gas

  • Gas points rough in complete

NBN

  • NBN roughin complete

PC Item wet area blocking

  • blocking installed

HVAC

  • ducted system installed

Windows and Doors

  • Entry door installed

  • windows installed

  • sliding doors installed

1st floor balcony

  • sheeting complete

  • waterproofing installed

Garage Door

  • Door blocks installed

  • motor blocks installed

Garage Slab Cutting required

  • slab cut required

Shaft Liner

  • shaft liner inspection certified

External wall

  • Wrap installed

  • battens installed

1st Floor

electrical

  • roughin complete

Plumbing

  • rough in complete

Manhole

  • manhole installed or blocked out

Bath frame and water stop

  • bath frame and water stop installed

PC Item wet area blocking

  • blocking installed

HVAC

  • ducted system installed

  • ducting installed

Windows and Doors

  • Entry door installed

  • windows installed

  • sliding doors installed

Shaft Liner

  • shaft liner inspection certified

Acoustic Requirements

  • acoustic requirements installed

  • Inspected and approved

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.