Title Page
-
Site conducted
-
Townhouse number
-
Conducted on
-
Prepared by
-
Location
Untitled Page
Ground Floor
electrical
-
roughin complete
Plumbing
-
rough in complete
gas
-
Gas points rough in complete
NBN
-
NBN roughin complete
PC Item wet area blocking
-
blocking installed
HVAC
-
ducted system installed
Windows and Doors
-
Entry door installed
-
windows installed
-
sliding doors installed
1st floor balcony
-
sheeting complete
-
waterproofing installed
Garage Door
-
Door blocks installed
-
motor blocks installed
Garage Slab Cutting required
-
slab cut required
Shaft Liner
-
shaft liner inspection certified
External wall
-
Wrap installed
-
battens installed
1st Floor
electrical
-
roughin complete
Plumbing
-
rough in complete
Manhole
-
manhole installed or blocked out
Bath frame and water stop
-
bath frame and water stop installed
PC Item wet area blocking
-
blocking installed
HVAC
-
ducted system installed
-
ducting installed
Windows and Doors
-
Entry door installed
-
windows installed
-
sliding doors installed
Shaft Liner
-
shaft liner inspection certified
Acoustic Requirements
-
acoustic requirements installed
-
Inspected and approved