Title Page

  • Site conducted

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Client Contact:

  • Date of Survey:

  • Client Office:

  • Principal Designer:

  • Site Address:
  • Telephone Number of Site:

  • Contact Name:

  • Name of Occupier:

  • Is the building to remain occupied during the works?:

Nature of Project

  • Nature of Works to be carried out:

  • Commencement Date

  • Completion Date:

  • Project Duration:

Existing Environment

  • Previous Use of the site

  • Current Use of the Site

  • Existing Structures

  • Previous Use of Adjacent Sites

  • Current or Anticipated Use of Adjacent Sites

  • Road and Traffic Systems Adjacent to the Site

Construction Phase Considerations (highlight any hazards associated with the following headings:)

  • Site Security

  • Existing structures - Instability / Pre-stressed structures

  • Asbestos

  • Deleterious Materials

  • Occupied Premises

  • Existing processes (by occupants)

  • Existing Machinery / Plant

  • Health Hazards Vermin / Moulds Dusts / Fibres / Legionella / Anthrax

  • Confined Spaces

  • Adjacent properties / Party wall

  • Water courses

  • Road / Traffic / Access / Delivery Hazards

  • Demolition

  • Contaminated Ground

  • Excavation

  • Excavation Collapse - Ground Water / Poor / Soft Ground

  • Existing live services (Underground / Overhead)

  • Moving Plant / Vehicles on site

  • Scaffolding

  • Erection Sequence

  • Mechanical Handling - Large items

  • Manual Handling

  • Work at Height - Falls, dropping of units

  • Use / Storage of Hazardous / Flammable Substances

  • Construction Pollution (Noise / Dust / Fumes / Vibration)

  • Tunnelling

  • Unexploded ordnance

  • Other:

Reports / Investigations

  • Existing Services: Survyey reports and onsite investigations

  • Gas:

  • Electricity:

  • Water:

  • Telecom:

  • Cable:

  • Drainage/Sewers:

  • Asbestos: Has a survey been commisioned?

  • Site Contamination / Ground Conditions: Has a site investigation been undertaken:

Local Authority Restrictions

  • Planning

  • Building Regulations

  • Further Site Restrictions

  • (Rights of way, etc.)

Site Wide Elements

  • Site Access / Egress Points

  • Location of Temporary Site Accommodation. Unloading Areas etc

  • Car Parking

  • Mess Room

  • Toilet Facilities

  • Drying Room

  • Site Office

On site traffic / pedestrian routes:

  • Occupier’s activities (3rd party considerations)

  • Site Security

  • Phasing Arrangements

  • Other Notes:

Inspection Completed by:

  • Name:

  • Signature:

  • {{NAME OF PROJECT / SITE}}

  • {{DATE OF INSPECTION}}

  • CONSTRUCTION SITE HEALTH AND SAFETY RISK MANEGEMENT INSPECTION RECORD

  • Aspect or Issue

  • Aspect or Issue

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.