Title Page
-
Site conducted
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Client Contact:
-
Date of Survey:
-
Client Office:
-
Principal Designer:
-
Site Address:
-
Telephone Number of Site:
-
Contact Name:
-
Name of Occupier:
-
Is the building to remain occupied during the works?:
Nature of Project
-
Nature of Works to be carried out:
-
Commencement Date
-
Completion Date:
-
Project Duration:
Existing Environment
-
Previous Use of the site
-
Current Use of the Site
-
Existing Structures
-
Previous Use of Adjacent Sites
-
Current or Anticipated Use of Adjacent Sites
-
Road and Traffic Systems Adjacent to the Site
Construction Phase Considerations (highlight any hazards associated with the following headings:)
-
Site Security
-
Existing structures - Instability / Pre-stressed structures
-
Asbestos
-
Deleterious Materials
-
Occupied Premises
-
Existing processes (by occupants)
-
Existing Machinery / Plant
-
Health Hazards Vermin / Moulds Dusts / Fibres / Legionella / Anthrax
-
Confined Spaces
-
Adjacent properties / Party wall
-
Water courses
-
Road / Traffic / Access / Delivery Hazards
-
Demolition
-
Contaminated Ground
-
Excavation
-
Excavation Collapse - Ground Water / Poor / Soft Ground
-
Existing live services (Underground / Overhead)
-
Moving Plant / Vehicles on site
-
Scaffolding
-
Erection Sequence
-
Mechanical Handling - Large items
-
Manual Handling
-
Work at Height - Falls, dropping of units
-
Use / Storage of Hazardous / Flammable Substances
-
Construction Pollution (Noise / Dust / Fumes / Vibration)
-
Tunnelling
-
Unexploded ordnance
-
Other:
Reports / Investigations
-
Existing Services: Survyey reports and onsite investigations
-
Gas:
-
Electricity:
-
Water:
-
Telecom:
-
Cable:
-
Drainage/Sewers:
-
-
-
Asbestos: Has a survey been commisioned?
-
Site Contamination / Ground Conditions: Has a site investigation been undertaken:
Local Authority Restrictions
-
Planning
-
Building Regulations
-
Further Site Restrictions
-
(Rights of way, etc.)
Site Wide Elements
-
Site Access / Egress Points
-
Location of Temporary Site Accommodation. Unloading Areas etc
-
Car Parking
-
Mess Room
-
Toilet Facilities
-
Drying Room
-
Site Office
On site traffic / pedestrian routes:
-
Occupier’s activities (3rd party considerations)
-
Site Security
-
Phasing Arrangements
-
Other Notes:
Inspection Completed by:
-
Name:
-
Signature:
-
{{NAME OF PROJECT / SITE}}
-
{{DATE OF INSPECTION}}
-
CONSTRUCTION SITE HEALTH AND SAFETY RISK MANEGEMENT INSPECTION RECORD
-
Aspect or Issue
-
Aspect or Issue