Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Site Safety
-
Have all contractors been inducted to site, show evidence
-
Have site specific SWMS been discussed, understood and signed off by all workers
-
Do the SWMS address all hazards identified on the site and are the controls methods acceptable
-
Are the SWMS compliant with WHS legislation particularly the name and signature of the person that created the SWMS and the review date of the SWMS.
-
Has the Verdia WHS booklet V-M-04 been signed off and the questionnaire completed, show evidence
-
Has a V-F-19 Construction Details and assessment form been completed for each worker<br>
-
Is a Traffic Management Plan required, if so show evidence of compliance
-
Has an Emergency Management Plan V-F 18 been completed?
-
Has a V-F-19 been completed?
-
Does the contractor have all necessary safety paperwork?(SWMS/JSA etc)
-
Does the contractor have relevant fall arrest systems for working at heights?
-
Do all site personnel have adequate PPE?
-
Is all test equipment in calibration date?
-
Is all applicable electrical equipment tested and tagged
-
Has worker license register been provided show register
-
Have Police background checks been provided, show evidence
Site Interaction
-
Have storage locations on site been determined and approved?
-
Has parking on site been arranged and approved?
-
Has access provisions been granted? (keys/swipecard/security codes)
-
Have work start and finish times been confirmed?
-
Has site contact been informed of power shutdown process for connection of solar?
Installation
-
Has roof access been confirmed and approved? (ewp/ladder/crane)
-
Has inverter location been approved?
-
Has panel location been defined and approved?
-
Has roof been inspected and deemed suitable for solar installation? (dillapidation report required from contractor with photos)
-
Has connecting switchboard been determined and is adequate connection space available?
Installation Materials
-
Have all installation materials been ordered?(PO confirmation required)
-
Has material delivery to site been confirmed?(Delivery date required)