Title Page

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Site Details

  • Site Address
  • CLIENT:

  • Select date

  • SITE ACCESS:

  • Site Times

  • PARKING:

  • Site Contact & Tel No

Isolations

  • Are there any live services effected by the works?

  • SERVICES To Be Isolated By Whom?

Utilities

  • LIGHTING?

  • POWER?

  • WATER?

  • WELFARE?

  • ACCESS EQUIPMENT?

  • Other Contractors On Site?

RISKS

  • Working At Height?

  • Confined Space

  • Slips, Trips & Falls

  • Manual Handling

  • Poor Lighting

  • Electric, Plant & Equipment

  • Noise

  • HAVS

  • Fire

  • Needles & Sharps

  • Vehicle Movement

  • Live SERVICES ( Electrical )

  • Live SERVICES ( Gas )

  • Live SERVICES ( Water )

  • Live SERVICES ( Other )

  • Bio Hazards ( infestation / Guano )

  • Leptospirosis

  • Public

  • Weather Conditions

Job Particulars

  • Any Special Requests From The Client

  • Type of Asbestos works

  • Number of Operatives

  • Number of Supervisors

  • Number of Days

  • Weekend Working

  • Night Working

  • Analytical Requirements

  • Type of Asbestos on This Project

  • How is the Asbestos Fixed

  • Number of Enclosures

  • AREA 1 Dimensions & NPU calculations

  • Enclosure construction AREA 1

  • Airlock & Baglock

  • AREA 1 Sketch

  • Quantity of Asbestos & Condition

  • AREA 1

  • AREA 2 Dimensions & NPU calculations

  • Enclosure construction AREA 2

  • Airlock & Baglock

  • AREA 2 Sketch

  • Quantity of Asbestos & Condition

  • AREA 2

  • AREA 3 Dimensions & NPU calculations

  • Enclosure construction AREA 3

  • Airlock & Baglock

  • AREA 3 Sketch

  • Quantity of Asbestos & Condition

  • AREA 3

  • AREA 4 Dimensions & NPU calculations

  • Enclosure construction AREA 4

  • Airlock & Baglock

  • AREA 4 Sketch

  • Quantity of Asbestos & Condition

  • AREA 4

  • AREA 5 Dimensions & NPU calculations

  • Enclosure construction AREA 5

  • Airlock & Baglock

  • AREA 5 Sketch

  • Quantity of Asbestos & Condition

  • AREA 5

  • Job Discription

  • Control Measures

  • Decontamination

  • RPE for this Project

  • PPE For This Project

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.