Title Page
-
Specific Work Type
-
Feature ID
-
Exchange
- Hengoed
- Neath
- Morriston
- Swansea
- Bridgend
- Llanelli
- Tonypandy
- Aberdare
- Llantrisant
-
Date
-
Gang Lead
-
Location
Health & Safety
-
Have You Completed A Risk Assessment (EVERY JOB requires a RA upload pic of completed form)
Pre-Site
-
Pre-Start photos (Take photos of immediate surroundings to show existing conditions and to protect yourself from any potential damage claims)
-
Site Set-up photos from each direction showing safe set-up
Reinstatement Evidence
-
Provide photos of cut back and show depth of existing surface (Use Tape measure / Depth board)
-
Photos of edge sealant on all vertical edges
-
Photo of compacted backfill including aspect view at least 5m radius (NOT JUST A CLOSE UP)
-
Reinstatement MUST comply to HAUC Specification not just matching existing surface. Carefully select the correct method from this document. Refer to full specification in the HAUC if necessary
-
Reinstatement Type
- A7.1 (A)
- A7.1 (B)
- A7.3 (A)
- A7.4 (A)
- A3.4 (A)
- A3.4 (B)
- A3.5 (A)
- A3.5 (B)
- A3.3 (A)
- A3.3 (B)
- Another
-
Reinstatement photos showing depth of base course including aspect view at least 5m radius (NOT JUST A CLOSE UP)
-
Reinstatement photos showing depth of surface course including aspect view at least 5m radius (NOT JUST A CLOSE UP)
Job Completion
-
Dig dimensions: length x Width - Breakdown measures by surface/Type (e.g FW = 3.4m x 0.4m, CW = 8.2m x 0.3m) or (Chamber = 1.9m x 1.3m - F/w, Duct = 1.7m x 0.4m - F/w)
-
Does reinstatement exceed 3m?
-
Record Grid Reference at Start Point
-
Record Grid Reference at End Point
-
Is all reinstatement Complete
-
Provide site clear photos from both directions
-
Provide photos of site left safe & secure until return visit
-
Please add any additional relevant information
Confirmation
-
Gang Lead Signature