Site Information

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Type of works

  • Pre inspection photos

  • Does applicant have public liability insurance, must be must be for a minimum $20million cover for all works and current. Please note, applications will be delayed if the public liability certificate does not meet these requirements

  • Does works require a TMP/MOA

  • Has TMP been submitted to Traffic team via portal?

Works inspection

  • Works inspection photos

  • Comments

Final inspection

  • Reinstatement works check

  • Photo"s of completed works

  • Completed in sufficient time

  • Cardinia Shire Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.