Pre-Task Elevated Work Checklist
-
Describe work to be done:
-
Estimate date range required of work to be done:
-
Are Mirror Drain/Waterproofing completed?
-
Is dowel protection in place?
-
Holes covered, secured and covered?
-
Type of ladder, scaffolding or man lift are they in compliance with known regulations?
-
Have you spoken with the formwork foreman or GC to ensure the deck is ready for access by our manpower and preloading of our reinforcing materials?
-
Name of the Foreman that you spoke with?
-
Have you walked the perimeter area before accessing with the manpower or preloading materials in the area?
-
Were all questions or concerns addressed by GC & forming contractor?
-
Rescue plan reviewed with the GC? (man basket & crane, man lift, ramps or other)
-
Is climbing rebar curtains with fall protection required?
-
Are vertical work bracing plans required? review plan if required.
-
If form work is provided, have you reviewed with GC or form work if it has been braced to handle rebar and manpower loads?
-
Do you have your vertical work plans completed, approved and signed off?
-
If engineered tie-off points are requested and supplied, are they inspected and signed off?
-
Does work described above require a Fall Protection Plan?
-
Please review.
-
Harness and Lanyard selection and inspection?
-
Lifeline or horizontal retractable line plan complete, retractables selected and inspected?
-
Rated for one person 5,000 lbs and two person 10,000 lbs
Reminder
-
Fall protection plans are required for all vertical work, these are to be reviewed and signed off by a Superintendent or Safety Department. Site condition adjustment can and should be made by Foreman as necessary.
undefined
-
***If you have questions or run into a scenario that your unsure about, contact you're Superintendent or Safety Department to discuss before accessing Elevated deck or vertical element.***