Pre-line plumbing/Build QA Checks
-
Pipe work is secured/supported/protected
-
Penetrations through building wrap taped
-
No Pipe work in cavity
-
Check HWC/tray
-
Water pressure test at 1500kpa for 30 minutes
-
Water test on stack system
-
Vent penetrating roof to have sleeves on
Pre-Line Build QA Checks
-
Framing moisture below required requirements
-
Insulation all complete & as per specifications
-
All engineering details been site checked by Engineer
-
Windows & Doors Secured, sealed
-
Window & Door protection in place
-
Bath packing & surround completed
-
Check safety glass
-
Site Clean
-
Other
-
Other