Title Page
-
Conducted on
-
Prepared by
-
Location
1.0 INTERIOR
-
1.1 Smoke Alarms Installed & Tested
-
1.2 Layout as per plan
-
1.3 Stairs / Balustrades / handrails
-
1.4 Outdoor awareness from habitable rooms
-
1.5 Light / ventilation to habitable rooms
-
1.6 F4 Openings - restrictors or barriers
-
1.7 Window / door glazing permanent markings sighted
-
1.8 Window & door joinery labelled as per NZS 4211
-
1.9 Hot Water supply available & type as per plan
-
1.10 Hot Water temperature test at basin / vanity, shower or bath
-
1.11 HWC source & type
-
1.12 HWC installation compliant
1.0.0 ROOF SPACE
-
1.0.1 Roof space access
-
1.0.2 Ceiling insulation installed correctly
-
1.0.3 Fire walls stopped
-
1.0.4 Mechanical extracts vented to exterior
1.1.0 BATHROOMS
-
1.1.1 Finishes complete / impervious
-
1.1.2 All fixtures trapped / vented
-
1.1.3 Floor waste installed as per plan
-
1.1.4 Shower enclose compliant
-
1.1.5 Ventilation
1.2.0 KITCHEN
-
1.2.1 Finishes complete & impervious
-
1.2.2 Sink / dishwasher trapped / vented
-
1.2.3 Floor waste gully
-
1.2.4 Extract hood type installed correctly
-
1.2.5 Hob clearance
-
1.3.0 LAUNDRY
-
1.3.1 Finishes complete & impervious
-
1.3.2 Floor waste gully
-
1.3.3 Waste traps vented
-
1.3.4 Ventilation
-
1.3.5 Non-potable water signage
2.0 EXTERIOR
-
2.1 Wall cladding integrity & type as per plan
-
2.2 Penetrations / junctions sealed & weatherproof (including under edges sealed & painted)
-
2.3 Window / door joinery weathertight
-
2.4 Vertical & horizontal control joints finished as per detail
-
2.5 Fire walls complete as per plans
-
2.6 Subfloor ventilation & access
-
2.7 Vermin proof
-
2.8 Finished ground level to floor clearances
-
2.9 Cladding to finished ground level clearances
-
2.10 Flashings complete & weathertight
-
2.11 Entry stairs / landing / handrail & barriers compliant
-
2.12 Driveway / paths & finishe ground levels
2.0.0 DRAINAGE
-
2.0.1 Cess pit locations & half siphon
-
2.0.2 Secondary flow path. No uncontrolled concentrated surface water flows
-
2.0.3 ORG / gully trap installed correctly
-
2.0.4 Waste pipe / downpipe support & terminal vent (TV)
-
2.0.5 Backflow prevention
-
2.0.6 Non-potable water signage
-
2.0.7 Rain water tank type, location & installation as per plan
2.1.0 BALCONY & DECK
-
2.1.1 Size & layout as per plan
-
2.1.2 Threshold step as per plan
-
2.1.3 Cladding clearance from deck level
-
2.1.4 Membrane slope
-
2.1.5 Barrier construction as per plan
-
2.1.6 Fixings correct & type
-
2.1.7 Subfloor & fixings as per plan
-
2.1.8 Stairs / landings / handrail & barriers compliant
-
2.1.9 Stair pitch, tread & riser dimensions. Risers equal +/- 5mm
-
2.1.10 Handrail graspable & continuous. Height compliant