Title Page

  • Lot Number

  • Conducted on

  • Prepared by

  • Location
  • Flashings Correctly Installed (Windows, Doors, Roofs, Parapets)

  • Sealing Of Penetrations- Electrical Cables Sleeved

  • Clearance Behind Fascias, Barge, Facings, Spoutings, Etc. (20mm Minimum)

  • Correct Clearance At Roofs, Decks (35mm Minimum)

  • Capillary Gap Behind Cladding (6mm Minimum)

  • Reveals/Facings To Joinery Of Face Sealed Cladding?

  • Junctions- Wall To Wall and Wall To Roof

  • Drip Edge

  • Roof Clean & Clear of all debris

  • Roof damage repaired or Replaced

  • Windows Goop removed, cleaned

  • Window Defects repaired

  • All Cladding completed

  • Gutters & Down pipes

  • Gutters Cleaned out

  • Vents Completed

  • Scaffold cleared of all debris

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.