Progress Report
-
Project Description
-
Location
-
Company
-
Principal Contractors Details
-
Date
-
Supervisors Name
PRE START CHECKLIST
-
Safety documentation received, reviewed and approved by management
-
Hard copies of Site Safe Plan & SWMS Documentation provided by the contractor
-
General Induction completed and site handed over to contractor
-
Dilapidation Images Taken
-
Construction Signage Installed
PRELIMINARIES AND ESTABLISHMENT ON SITE
-
PRELIMINARIES AND ESTABLISHMENT ON SITE CHECKS
-
Toilet Facilities onsite
-
Access to power to complete works
-
Heat management system in place
-
Temporary Spoil Bunds
-
Site Shed
-
Site Office
-
Site Lunch area
-
Material Lay down Area Established
-
Temporary Fencing / Barricading erected
TRAFFIC MANAGEMENT
-
Traffic Management required for works
-
Supply traffic management arrangements including all necessary documentation
-
Road hording in place
-
Pedestrians walk through in place
ENVIRONMENTAL CONTROL
-
ENVIRONMENTAL CONTROL
-
Silt fence - Sediment and erosion control measures
-
Dust control measures in place
PRE-CONSTRUCTION SURVEYING/AS CONSTRUCTED DOCUMENTATION
-
PRE-CONSTRUCTION SURVEYING/AS CONSTRUCTED DOCUMENTATION
PERCUREMENT
-
MATERIAL REQUIRED FOR WORKS (LOCKS, SIGNAGES, SPECILIST EQUIPTMENT)
PHOTOS
-
IMAGE UPLOAD