Title Page
-
Conducted on
-
Prepared by
-
Location
-
Level
-
Panel Numbers to be installed
Prestart Checklist
-
Exclusion zone
-
EWP Logbook has been filled out
-
Toolbox Talk has been completed
-
Builder to confirm slab strength 20 mPa for Brace sets or 8mPa for Rapid brace
-
Site Representative to confirm cast in rapid brace or equivalent have been installed correctly as per manufactures recommendations
Sign off
-
Site Representative
Installation Checklist
-
Panels have been installed to survey marks
-
Panels installed within 8mm of vertical plumb
-
Panel face alignment within 5mm
-
Panels have minimum two restraint fixings
-
Panel props are all locked and removed from panel if not in use
-
Any transport damage
-
Any erection damage
-
Dowel voids have been grouted with liquid grout
-
Has bed grouting been completed
-
Has Grout been mixed in line with manufactures recommendations for bed and dowel grouting
-
Plastic has been laid prior to mixing grout
-
Have all dowels been installed in correct position and to the correct length ? If not please explain why.
-
Area has been cleaned from grout and all rubbish in the bins provided
-
Were there any delays during erection
-
Have all panels been installed as per drawings provided ? If answer is no please fill out details below
-
Is site representative satisfied with panel placement and installation and agree all panels align and are installed in required position. If no please specify.
Sign off
-
Site Representative
-
Prestige Precast Representative
Representatives comments or remarks
-
undefined