Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Quality Control
-
Has owner equipment been coordinated with casework
-
Have cut sheets been sent to the casework subcontractor?
-
Has keying coordination meeting taken place?
-
Have the flooring types & colors been approved?
-
Flooring installed as specified?
-
Have the paint colors been approved?
-
Paint colors installed as specified?
-
Have the wall protection colors been approved?
-
Wall protection installed as specified?
Owner Furnished Items
-
Headwalls to be on site by:
-
Add media
-
TV Brackets to be on site by:
-
Add media
-
Patient Room Environment
-
Add media
-
Countertop ice machine to be on site by:
-
Add media
-
TVs (needed for nurse call certification) to be on site by:
-
Add media
-
Patient Beds
-
Add media
-
Local Appliances
-
Add media
-
Telemetry
-
Add media
-
Furniture
-
Add media
Vendors
-
Nurse call overhead to begin:
-
Add media
-
Security cable wiring to begin:
-
Add media
-
Signage to be installed (after final punch):
-
Add media
-
Shelving to be installed:
-
Add media
-
Telephone/data overhead to begin:
-
Add media
-
Blinds installation:
-
Add media
Subcontractors Onsite
-
Sitework
-
Add media
-
Concrete
-
Add media
-
Precast
-
Add media
-
Steel Erector
-
Add media
-
Plumbing/Med Gas
-
Add media
-
Waterproofing/Caulking
-
Add media
-
Fireproofing
-
Add media
-
Electrical
-
Add media
-
HVAC
-
Add media
-
Drywall
-
Add media
-
Flooring
-
Add media
-
Casework/Millwork
-
Add media
-
Painting
-
Add media
Progress Photos
-
Add media
Action Items
-
Current Action Items:
Move-in Checklist
Comments
-
Summary
Signatures
-
Report performed by: