Title Page
-
Project Name
-
Company
-
Created On
-
Author
-
Location
-
INSTRUCTIONS
1. Answer "Positive Observation", "Needs Corrected", "Compliant" or "N/A" on the questions below.
2. Add photos and notes by clicking on the paperclip icon
3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link
General Details
-
Project Description
-
Priority Level
-
Status
General Site Conditions - Subpart C
-
C.1 Jobsite address posted in trailer and main entrance to site
-
C.2 Jobsite signage, safety signs posted, controlled access
-
C.3 Emergency phone numbers posted (foremans, subs, owners, utilities, medical facilities)
-
C.4 Emergency action plan in place
-
C.5 Adequate dumpsters and trash barrels surrounding area cleaned)
-
C.6 Sanolets clean and staked down on soil or in contained area
-
C.7 Housekeeping, graffiti (work areas and break areas)
-
C.8 Exits through and from building clear and unobstructed
-
C.9 Proper ventilation (fans/exhaust ducts)
-
C.10 Nails/Screws/Staples removed or bent in lumber
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Personnel Protective Equipment - Subpart E
-
E.1 Hardhats, safety glasses, gloves, knee pads, face masks
-
E.2 First aid kit available and stocked
-
E.3 Work zone protection - vests/signs/cones/barricades/TCP
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Excavations - Subpart P
-
P.1 Daily dig permits completed by competent persons
-
P.2 Utilities located by individual contractors - current, w/in 30 days
-
P.3 Trenches deeper than 5ft implementing trench safety procedures
-
P.4 Trench box safety procedures in place (tabulated data available)
-
P.5 Ramps/Ladders every 50ft (25ft either direction) when 4ft or deeper
-
P.6 Open excavations, road drop offs, trenches, manholes, uneven surfaces - barricaded and have proper notification
-
P.7 Existing utilities shored/supported properly
-
P.8 Trenches 20ft or deeper to have engineer certification
-
P.9 Walkways provided over trenches (>20" wide)
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Materials Handling & Equipment - Subpart H
-
H.1 Cranes flagged, roped off
-
H.2 Crane certification provided and with crane
-
H.3 All equipment - Level/stable work pad, proper distance from excavations/trenches
-
H.4 No employees under suspended loads / tag lines on loads
-
H.5 Rigging devices inspected daily (chains, chokers, slings)
-
H.6 Materials staged 15ft back from leading edge
-
H.7 Equipment back-up alarms functional and audible
-
H.8 Operator certifications provided (forklifts)
-
H.9 Aerial lifts/manlifts - harnesses being used
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Fall Protection - Subpart M
-
M.1 Floor and/or roof openings/holes covered and marked
-
M.2 Overhead protection from employee/pedestrian walkways
-
M.3 Walkways higher than 4ft properly protected
-
M.4 Perimeter cable installed and flagged every 6ft
-
M.5 Guardrails in place and able to withstand 200lb load
-
M.6 Proper tie-off points (able to withstand 5,000lb)
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Stairways & Ladders - Subpart X
-
X.1 Handrails on stairs and exposed edges
-
X.2 Metal pan stairs poured/blocked out/closed off
-
X.3 Stairwells clear and unobstructed
-
X.4 Stairs with >4 risers or 30" high, equipped with handrails
-
X.5 Leading edges protected/identified (controlled access zone)
-
X.6 Ladders extended 3ft above landing, secured, good access
-
X.7 Ropes provided at ladders for material/tool retrieval
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Scaffolds - Subpart L
-
L.1 Planking meeting OSHA requirements and in good condition
-
L.2 Working platforms fully planked (no more than 1" separation)
-
L.3 Planking properly installed (between 6"-12" overhang at supports, less than 6" tie down or cleat)
-
L.5 Toe boards & guardrails on scaffolding over 6ft high
-
L.6 Tie-ins, pins, & braces installed as required
-
L.7 Mudsills properly installed under base plates
-
L.8 Proper access pts. (ladders provided when necessary)
-
L.9 Properly secured/anchored (4 x width vertically, then every 15ft length)
-
L.10 Proper loading of planking (1/12 deflection, 4 x intended ld.)
-
L.11 Inspected daily and documented, tagged for service
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Concrete/Steel - Subpart Q&R
-
QR.1 Proper bracing/guying (deadman, proper hardware/anchors)
-
QR.2 Rebar caps used
-
QR.3 Wall forms - work platforms fully planked, guardrails in place and proper access (no less than 39" from platform to top of form)
-
QR.4 Controlled access to erection areas
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Fire Safety & Welding/Cutting - Subpart F&J
-
FJ.1 Fire Extinguishers, 1/3000SF or within 100ft of workers, currently inspected, serviced, and located in appropriate areas.
-
FJ.2 Metal gas cans (plastic not permitted)
-
FJ.3 Extinguishers present during all hot work (stop work 30 minutes prior to leaving site)
-
FJ.4 Fuels properly stored/barricaded/labeled (20ft separation O&A, stored vertically, caps in good condition, no unused tanks in bldg)
-
FJ.5 Fire watch/hot work permits required
-
FJ.6 PPE being used with torches (gloves, goggles, face shields)
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Electrical - Subpart K
-
K.1 Assured grounding, GFCI's checked and documented
-
K.2 Permanent power- all drop chords GFCI
-
K.3 Chords, plugs in good condition & protected from traffic/damage
-
K.4 Proper distance from overhead powerlines (10ft min.)
-
K.5 Proper illumination/temp lighting (min. 3 foot-candles)
-
K.6 Temporary lighting - properly suspended, cages intact, no burned out/missing bulbs, spliced properly insulated, cord feeds in good condition
-
K.7 Panels marked and/or labeled, secured, and weather resistant
-
K.8 Lockout/tagout in place
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Miscellaneous Items
-
1.1 Laser & powder actuated signs posted and users trained
-
1.2 Confined spaces - evaluated, classified (permitted/non-permitted), air monitoring available, air quality documented
-
1.3 Finish products protected
-
1.4 Materials stored properly and labeled
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Project Admin and Documentation
-
PA.1 State and OSHA right to know information posted
-
PA.2 Workers Compensation clinics posted
-
PA.3 Site specific cards with project contact info posted
-
PA.4 Project specific emergency action plan in place
-
PA.5 Site specific orientation/safety plan completed
-
PA.6 Site Specific orientations being conducted and properly documented
-
PA.7 Daily Pre-Task Meetings held by each supervisor
-
PA.8 Five pre-task meeting sheets reviewed for quality (relevant hazards and controls)
-
PA.9 Daily pre-task meetings effective verified by employee interviews
-
PA.10 Records of safety violations maintained with corrective actions completed
-
PA.11 Monthly documented safety audits being conducted
-
PA.12 Monthly documented safety meetings being conducted
-
PA.13 Pre-construction safety meetings conducted for utilities; steel/pre-cast; roofing; etc.
-
PA.14 Hazard communication lists are maintained and MSDS access procedure in place
-
PA.15 Random employee interviews indicate safety rules are being enforced on the project
-
Do you have other Misc. comments?
-
List other Misc. comments
Comments
-
Details
-
Select response
-
To add more Other/Misc. comments, scroll up and click on "+Add"
Signature
-
Completed by