Title Page

  • Project Name

  • Company

  • Created On

  • Author

  • Location
  • INSTRUCTIONS

    1. Answer "Positive Observation", "Needs Corrected", "Compliant" or "N/A" on the questions below.
    2. Add photos and notes by clicking on the paperclip icon
    3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date
    4. Complete audit by providing digital signature
    5. Share your report by exporting as PDF, Word, Excel or Web Link

General Details

  • Project Description

  • Priority Level

  • Status

General Site Conditions - Subpart C

  • C.1 Jobsite address posted in trailer and main entrance to site

  • C.2 Jobsite signage, safety signs posted, controlled access

  • C.3 Emergency phone numbers posted (foremans, subs, owners, utilities, medical facilities)

  • C.4 Emergency action plan in place

  • C.5 Adequate dumpsters and trash barrels surrounding area cleaned)

  • C.6 Sanolets clean and staked down on soil or in contained area

  • C.7 Housekeeping, graffiti (work areas and break areas)

  • C.8 Exits through and from building clear and unobstructed

  • C.9 Proper ventilation (fans/exhaust ducts)

  • C.10 Nails/Screws/Staples removed or bent in lumber

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Personnel Protective Equipment - Subpart E

  • E.1 Hardhats, safety glasses, gloves, knee pads, face masks

  • E.2 First aid kit available and stocked

  • E.3 Work zone protection - vests/signs/cones/barricades/TCP

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Excavations - Subpart P

  • P.1 Daily dig permits completed by competent persons

  • P.2 Utilities located by individual contractors - current, w/in 30 days

  • P.3 Trenches deeper than 5ft implementing trench safety procedures

  • P.4 Trench box safety procedures in place (tabulated data available)

  • P.5 Ramps/Ladders every 50ft (25ft either direction) when 4ft or deeper

  • P.6 Open excavations, road drop offs, trenches, manholes, uneven surfaces - barricaded and have proper notification

  • P.7 Existing utilities shored/supported properly

  • P.8 Trenches 20ft or deeper to have engineer certification

  • P.9 Walkways provided over trenches (>20" wide)

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Materials Handling & Equipment - Subpart H

  • H.1 Cranes flagged, roped off

  • H.2 Crane certification provided and with crane

  • H.3 All equipment - Level/stable work pad, proper distance from excavations/trenches

  • H.4 No employees under suspended loads / tag lines on loads

  • H.5 Rigging devices inspected daily (chains, chokers, slings)

  • H.6 Materials staged 15ft back from leading edge

  • H.7 Equipment back-up alarms functional and audible

  • H.8 Operator certifications provided (forklifts)

  • H.9 Aerial lifts/manlifts - harnesses being used

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Fall Protection - Subpart M

  • M.1 Floor and/or roof openings/holes covered and marked

  • M.2 Overhead protection from employee/pedestrian walkways

  • M.3 Walkways higher than 4ft properly protected

  • M.4 Perimeter cable installed and flagged every 6ft

  • M.5 Guardrails in place and able to withstand 200lb load

  • M.6 Proper tie-off points (able to withstand 5,000lb)

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Stairways & Ladders - Subpart X

  • X.1 Handrails on stairs and exposed edges

  • X.2 Metal pan stairs poured/blocked out/closed off

  • X.3 Stairwells clear and unobstructed

  • X.4 Stairs with >4 risers or 30" high, equipped with handrails

  • X.5 Leading edges protected/identified (controlled access zone)

  • X.6 Ladders extended 3ft above landing, secured, good access

  • X.7 Ropes provided at ladders for material/tool retrieval

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Scaffolds - Subpart L

  • L.1 Planking meeting OSHA requirements and in good condition

  • L.2 Working platforms fully planked (no more than 1" separation)

  • L.3 Planking properly installed (between 6"-12" overhang at supports, less than 6" tie down or cleat)

  • L.5 Toe boards & guardrails on scaffolding over 6ft high

  • L.6 Tie-ins, pins, & braces installed as required

  • L.7 Mudsills properly installed under base plates

  • L.8 Proper access pts. (ladders provided when necessary)

  • L.9 Properly secured/anchored (4 x width vertically, then every 15ft length)

  • L.10 Proper loading of planking (1/12 deflection, 4 x intended ld.)

  • L.11 Inspected daily and documented, tagged for service

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Concrete/Steel - Subpart Q&R

  • QR.1 Proper bracing/guying (deadman, proper hardware/anchors)

  • QR.2 Rebar caps used

  • QR.3 Wall forms - work platforms fully planked, guardrails in place and proper access (no less than 39" from platform to top of form)

  • QR.4 Controlled access to erection areas

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Fire Safety & Welding/Cutting - Subpart F&J

  • FJ.1 Fire Extinguishers, 1/3000SF or within 100ft of workers, currently inspected, serviced, and located in appropriate areas.

  • FJ.2 Metal gas cans (plastic not permitted)

  • FJ.3 Extinguishers present during all hot work (stop work 30 minutes prior to leaving site)

  • FJ.4 Fuels properly stored/barricaded/labeled (20ft separation O&A, stored vertically, caps in good condition, no unused tanks in bldg)

  • FJ.5 Fire watch/hot work permits required

  • FJ.6 PPE being used with torches (gloves, goggles, face shields)

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Electrical - Subpart K

  • K.1 Assured grounding, GFCI's checked and documented

  • K.2 Permanent power- all drop chords GFCI

  • K.3 Chords, plugs in good condition & protected from traffic/damage

  • K.4 Proper distance from overhead powerlines (10ft min.)

  • K.5 Proper illumination/temp lighting (min. 3 foot-candles)

  • K.6 Temporary lighting - properly suspended, cages intact, no burned out/missing bulbs, spliced properly insulated, cord feeds in good condition

  • K.7 Panels marked and/or labeled, secured, and weather resistant

  • K.8 Lockout/tagout in place

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Miscellaneous Items

  • 1.1 Laser & powder actuated signs posted and users trained

  • 1.2 Confined spaces - evaluated, classified (permitted/non-permitted), air monitoring available, air quality documented

  • 1.3 Finish products protected

  • 1.4 Materials stored properly and labeled

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Project Admin and Documentation

  • PA.1 State and OSHA right to know information posted

  • PA.2 Workers Compensation clinics posted

  • PA.3 Site specific cards with project contact info posted

  • PA.4 Project specific emergency action plan in place

  • PA.5 Site specific orientation/safety plan completed

  • PA.6 Site Specific orientations being conducted and properly documented

  • PA.7 Daily Pre-Task Meetings held by each supervisor

  • PA.8 Five pre-task meeting sheets reviewed for quality (relevant hazards and controls)

  • PA.9 Daily pre-task meetings effective verified by employee interviews

  • PA.10 Records of safety violations maintained with corrective actions completed

  • PA.11 Monthly documented safety audits being conducted

  • PA.12 Monthly documented safety meetings being conducted

  • PA.13 Pre-construction safety meetings conducted for utilities; steel/pre-cast; roofing; etc.

  • PA.14 Hazard communication lists are maintained and MSDS access procedure in place

  • PA.15 Random employee interviews indicate safety rules are being enforced on the project

  • Do you have other Misc. comments?

  • List other Misc. comments

  • Comments
  • Details

  • Select response

  • To add more Other/Misc. comments, scroll up and click on "+Add"

Signature

  • Completed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.