Information
-
Precast Panel Inspection Checklist
-
Floor Level
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Plant and Equipment Safety
-
EWP plant checks are complete (Pre-start)?
-
All electrical equipment is tested and tagged?
Risk Management
-
Is floor slab clear to allow safe operation of EWP?
-
Misc- Any contributing hazards impacting safe panel install?<br>
Dowels & Packers
-
Dowel pin set out and packer locations are as per approved drawings?
Precast Panel Inspection
-
Panel is straight and free from twist, bows etc?
-
Panel numbers and location match approved drawings?
-
Ferrules, rebates, panel finish etc are correct and as per workshop approved drawings?
Precast Alignment / Panel props
-
Panel Props are secure and brace locking pins are all locked to prevent dislodgement of the locking pin?
-
Precast Panels are plumbed /aligned as per approved drawings?
Corner brackets and plates
-
Are corner brackets and plates installed as per approved drawings?