Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Audit Criteria
WHS Management Plan
-
Has the Plan been developed and authorised for the project?
-
Has the Plan been reviewed, at frequencies not exceeding 6 months?
-
Has the Plan been issued to Subcontractors at Tender stage and when updated?
-
Have changes to the Plan been communicated at WHSE Committee Meetings?
-
Have all members of the team signed onto the Plan?
Safety in Design
-
Are safety in design workshops held?
-
Are safety in design assessments completed and reflect requirements under the Regulations, such as Confined Spaces, HMT's, Hazardous Substances, etc.
-
Are the unresolved design issues transferred into the project risk register?
Risk Register & Workshops
-
Has the Risk Register been developed and is Site Specific?
-
Has the Register been reviewed at frequencies in accordance with the WHS Plan?
-
Does the Register unresolved risks from the Safety in Design process?
-
Are the controls in the register effective for the nature of the work?
Training & Competency
-
Have personnel performing HRCW produced applicable licenses for the works?
-
Have personnel completed nominated training in accordance with the competency framework?
-
Are subcontractors conducting training relevent to their work?
-
Have all nominated HSR's been trained?
Inductions
-
Have all workers been inducted?
-
Is the Induction reflective of current activities on site?
-
Are visitors being registered and accompanied by an inducted person?
-
Does the Induction advise that Legislation, Standards & Codes are available?
-
Does the Induction advise that the Plan is available to workers at their request?
Audits
-
Are subcontractor Audits Conducted?
-
Have identified corrective actions/NCR's been closed out?
Incident Management & Emergency Preparedness
-
Is the incident management process being followed
-
Have Incidents been investigated in accordance with the investigation process?
-
Have lessons learnt from incidents been shared with subcontractors?
-
Have corrective actions been implemented and closed out?
-
For injured workers, has the injury management process been followed?
-
Has an Emergency Management Plan been developed for the project?
-
Has the Emergency Management Plan been reviewed at least 6 monthly?
-
Have project specific emergency scenarios been identified and documented in the plan?
-
Have emergency processes been tested in accordance with the plan?
-
Is emergency equipment available, maintained and appropriate to the works?
-
Has an emergency response team been formed and trained?
-
Has an emergency response team been formed and trained?
Inspection, Testing & Monitoring
-
Are WHS Inspections conducted in accordance with KPI's?
-
Are Task Observations conducted in accordance with KPI's?
-
Is equipment calibrated in accordance with manufacturer's requirements?
-
Are WHSE Committee Inspections conducted?
-
Is plant & equipment inspected and serviced in accordance with manufacturer's requirements?
Consultation
-
Are daily prestarts conducted?
-
Are toolbox meetings conducted monthly as a minimum?
-
Has a WHSE Committee been formed and meet weekly?
-
Have HSR's been elected by their workgroup and formally recorded?
-
Has WHSQ been informed of current HSR contacts?
-
Has a workplace notice board been installed including all information required by the WHS Plan?
-
Is relevant documentation shared where appropriate; i.e. WHSE Committee Minutes, lessons learnt, Notices, etc.
SAFE WORK METHOD STATEMENTS
-
Are SWMS developed for High Risk Work
-
Has a SWMS review checklist been completed?
-
Is there evidence that workers have acknowledged the SWMS for their activities?
-
Are SWMS reviewed every 12 months or where there is a change to the work process, or after an incident?
-
Where observed, is work being conducted in accordance with the SWMS?
Site Establishment
-
Has an Occupational First Aider conducted a First Aid Assessment for room and provision requirements?
-
Are first aid kits restocked regularly?
-
Are adequate amounts of first aiders available (1:25)?
-
Is First Aid Signage erected including nominated first aiders?
-
Are adequate facilities provided for staff and workers; i.e. toilets, coolers, sheds, etc
-
Has perimeter fencing/hoarding been installed, is secure and stable, and designed?
-
Has a gantry been installed where required as per engineer design?
-
Is clear and defined access available including seperation of workers and vehicles?
-
Has mandatory signage been installed along the perimeter of site including PPE & QBCC signage?
-
Is access lighting installed for entry/exit where required?
-
Are no smoking signs displayed?
-
Are shaker grids/cleaning equipment where applicable available for vehicles prior to exit from site?
Access & Egress
-
Are access ways clean, unobstructed and clearly defined?
-
Is access lighting installed, tested and signed in accordance with AS3012?
-
Are emergency escape routes clearly defined?
-
Is there separation of people and plant where interaction occurs?
Silica Dust & Air Quality
-
Are controls implemented in accordance with Appendix 4 of the Silica Code?
-
Are monitoring activities conducted where appropriate to determine if WES are regularly exceeded?
-
Are controls captured in SWMS?
-
Is appropriate RPE utilised and fit tested?
-
Is health surveillance conducted where applicable?
Asbestos
-
Has an Asbestos Register been developed/provided where appropriate?
-
Has an Asbestos Control Plan been developed for licensed removal work?
-
Has the Regulator been notified of the removal work?
-
Have clearance certificates been issued by the licensed removalist, including records of waste transport dockets?
Confined Space
-
Has a confined space permit been developed and approved for the work?
-
Have all persons associated in the confined space activity been trained for their role?
-
Have SWMS been developed and approved for the activity, including emergency response arrangements?
Cranes
-
Has a third party engineer verified the commissioning and erection documentation?
-
Have the crane/s been serviced in accordance with manufacturers requirements?
-
Has the operator/s conducted familiarisation training?
-
Has a procedure been developed and implemeted for coordination of plant sharing air space with cranes?
-
Have lifting plans been developed for required activities such as tilt up/precast?
-
Have ground conditions been confirmed as adequate prior to outrigger setup?
-
Has cranesafe certificates been provided?
-
Is all lifting equipment inspected and identified as current?
Hazardous Substances/Dangerous Goods
-
Are SDS' and Risk Assessments readily available for DG/HS products?
-
Are DG/HS substances stored and seperated in accordance with the SDS?
-
Have workers been trained into the use, storage and disposal of these products as per the SDS and/or SWMS?
-
Are substances appropriately bunded or spill kits of the correct type available for the quantity stored?
-
Are containers appropriate to the substance and correctly labelled?
-
Is DG/HS signage displayed at the storage facility and emergency equipment available?
Demolition
-
Has a demolition plan been developed for the work?
-
Has WHSQ been notified prior to demolition work occurring?
-
Have services been identified and isolated prior to the work occuring?
-
Has a demolition permit been developed and approved prior to works occuring?
Electrical
-
Are switchboards and temporary construction wiring installed in accordance with AS3012?
-
Is access lighting in place, with emergency signs and battery backup drain test completed?
-
Has the electrical contractor maintained a register for electrical installations?
-
Are contractors inspecting, testing and maintaining electrical equipment?
Excavation
-
Are excavations greater than 1.5m benched, battered, shored or otherwise inspected by a geotechnical engineer?
-
Are open excavations inspected by a competent person?
-
Are excavation permits utilised and approved, including identification of any services?
-
Is safe access and egress provided for workers within the excavation?
-
Where shoring systems are used, has a geotechnical engineer approved the system for the intended loads of the excavation?
-
Has the excavation been secured from unauthorised access and potential falls by barricades, fencing, etc and signage?
-
Has the zone of influence of the excavation been considered regarding plant movement or material storage?
Falling Objects
-
Wherever possible, are perimeters encapsulated to prevent objects falling?
-
Are perimeters clean and clear of materials to prevent objects falling?
-
Are zones established and signed on open perimeters and penetrations to identify need for tool/equipment tethers, hard hat restraints, and other falling object controls?
-
Are exclusion zones established and maintained below areas where objects could reasonably fall?
-
Are hoardings installed to control falling objects as per Regulations?
-
Is perimeter containment screening installed and fully encapsulated to prevent objects falling as per the Regulations?
-
Are catch platforms installed and secure, with SWL identified on them if used as a working platform?
-
If adjoining areas/properties are excluded, has approval been sought?
-
Where gantries are installed, are they installed and protected as per Regulations?
-
Where materials are lifted, are they lifted in a way to prevent objects falling?
Fire Protection Systems
-
Are fire extinguishers available at egress points on each floor with signage displayed?
-
Are fire hydrants installed and charged when the building has reached an effective height of 12m, and within two floors of the deck under construction?
-
Are Hot Works Permits developed for activities that generate sparks, flash, etc.
-
Is task specific fire equipment available for hot works?
Formwork
-
Has a formwork plan been developed and approved by a competent person or RPEQ as required by the formwork code?
-
Are handover inspections completed prior to pour, with evidence of close out of issues raised by the engineer where appropriate?
-
Have inspections been completed pre and post jumping of screens and jumps?
-
Are penetrations protected and adequately covered?
-
Is adequate access provided to decks/jumps as per the formwork code?
-
Have emergency procedures been developed and tested for jumps?
-
Is a system of work developed and implemented for stripping; including verification to strip, exclusion zones, method of stripping, cleanup, etc?
-
Does the formwork process include effective management of falling objects?
Hazardous Manual Tasks
-
Has a Hazardous Manual Tasks Assessment been completed where HMT risks occur?
-
Has the safety in design risk assessment considered HMT risks?
-
Where observed, are HMT risks effective in practice or could an alternative way be conducted?
-
Are workers trained into Hazardous Manual Tasks risks?
Housekeeping
-
Are general areas clean and clear, with material stored in an orderly fashion?
-
Are adequate amounts of bins available and accessible?
-
Are contractors regularly cleaning their designated work areas progressively?
-
Are dust controls utilised for housekeeping activities?
Noise
-
Have noise assessments been conducted for plant/activites that may exceed designated thresholds?
-
Have appropriate noise control measures been documented and implemented; i.e. barriers, maintenance, seperation, signage, PPE
-
Have complaints for excessive noise been documented and resolved?
PPE
-
Are higher order controls available in lieu of PPE?
-
Have workers been trained in the use and maintenance of PPE?
-
Are workers wearing appropriate PPE for the task and is it in good condition?
-
Has Sunscreen been provided for workers?
-
Has height safety equipment been inspected by a height safety inspector at 6 month intervals?
-
Is appropriate PPE signage displayed?
Plant & Equipment
-
Are mobile plant checklists completed and verified for all powered mobile plant on site?
-
Is design/plant registration completed for appropriate plant; e.g. Cranes, pumps, hoists, etc.
-
Is there clear separation of people and plant?
-
Is signage displayed for mobile plant operating in areas?
-
Is plant operated by competent/licensed personnel?
-
Are certificates of calibration current for relevant equipment?
-
Are keys removed from plant at end of shift and plant stored safely?
-
Are mobile plant outrigger setup permits completed and approved prior to setup?
Precast
-
Has a certificate of compliance been completed for each panel including engineer inspections, concrete test results, etc
-
Have shop drawings been provided for each panel?
-
Has a designer approved the shop drawings, rigging configuration and bracing design if applicable?
-
Has a lift plan been developed for the installation of panels?
-
Are panels stored and secured as per design?
-
Has lifting equipment been inspected and tested?
-
Are secondary lifters utilised when lifting over people?
-
Is an effective system in place for lifting of panels; communication of activity, warning systems during lifting, defined movement and exclusion zones, etc.
-
Has an engineer approved the removal of braces where appropriate?
Scaffold
-
Have scaffold plans been developed and approved; including any designer, supplier or manufacturer's requirements?
-
Has the scaffold (including mobile and edge protection) been installed by competent or licensed persons?
-
Has fire retardent shadecloth been used?
-
Is the supporting structure/ground suitable for the scaffold loads?
-
Are handover certificates and monthly inspections completed?
-
Is the scaffold protected from impact of vehicles or plant?
-
Is a tie register in place and current, including torque wrench calibration?
-
Has the scaffold been installed as per the design, using a safe system of work?
Traffic Management
-
Has a Traffic Management Plan (TMP) been developed for the project; including internal traffic risks as well as external?
-
Have Traffic Guidance Schemes (TGS) been developed by a qualified person and approved by council and Qld Police?
-
Are permits current and reflective of the scope of works?
-
Are traffic controllers qualified and inducted into their roles and responsibilities?
-
Are daily signage checklists being completed?
-
Does the signage setup reflect the TGS requirements; where different has this been documented?
-
Is there evidence of regular traffic management inspections?
Work at Height
-
Are work at height activities conducted in accordance with the hierarchy of control? i.e. work from ground or solid construction, a fall prevention device, work in fall restraint, work in fall arrest.
-
Are platform ladders or other plant (scaffold, MEWP's) used in lieu of A frame ladders?
-
Are workers trained to conduct Work at Height acivities?
-
Is the over/under permit process implemented and effective?
-
Where works are conducted near perimeter edges and penetrations, are controls implemented to prevent persons and objects falling; such as tethers, exclusions for ladder work, exclusion zones, nets, etc?
-
Is a rescue plan in place for retrieval from heights?