Title Page
-
Document No.
-
Lake Norden Cheese Expansion
-
Agropur
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Does membrane wrap into new precast?
-
Does membrane termination prevent water from flowing underneath it?
-
Is 3” seam tape and 6” strip flashing being installed where new membrane meets existing.
-
Is existing insulation staggered correctly?
-
Are ballasts placed correctly?
-
Is ponding or the potential for ponding present?
-
Does current installation achieve purpose of displacing or retaining water?
-
Is water leaving roof by appropriate methods such as scuppers or pump?
-
Is roof free of debris and waste and anything that could puncture roofing membrane?
-
Are hazards such as ammonia lines, conduits, slips, trips, falls present?