Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Precast
-
Panels installed today:
-
Panel joints/brick joints are vertically plumb and in line<br>
-
Panel joints/brick joints are horizontally in line and true to grid
-
Window, door, and MEP rough openings are correct in size and location
-
Any "site" adjustments made today (note below and attach photos)
-
Inspections (note below any issues and attach photos)
-
All panels are secured before leaving at night
-
Panels are installed today are free of damage
-
Rope weeps are installed under loose granite sills (Gresser)
-
Additional notes
Curtain Wall
-
Interclad QC sign off on openings prior to setting frames
-
All precast caulking required at heads and sills for frame installation is complete
-
Frames installed today
-
Horizontal, vertical, and interior alignment appear consistent and correct
-
Frames and glass appear to be without damage
-
Interior sill and stool trim protective covering is installed
-
MB-2/MB-3 is installed at 1st floor window sill locations and terminated properly. End dams are present at jamb conditions.
-
All frames and glass have been secured prior to leaving for the night
-
Swing stages are secure for the night
-
Inspections (note below any issues/attach photos)
-
Additional Notes
Caulking
-
General areas caulked today
-
All joints are cleaned and primed
-
Correct caulk color is being installed
-
Joints are tooled smoothly and uniformly
-
Any excess caulk is wiped clean from adjacent surfaces
-
Weep systems/baffles are clear of caulking
-
Swing stages are secure at the end of each day
-
Additional notes
Metal Panels
-
Vapor/Air barrier is properly installed and sealed to substrate prior to metal panel installation beginning
-
Metal panels are free of scratches, dings, dents.
-
Weeps and baffles are present and installed properly
Insulation/Vapor Barrier
-
FSK tape has 1" loop at curtain wall head<br>
-
Gutter/drainage channels and weep tubes are clear of debris prior installing FSK insulation
-
Vapor barrier is properly terminated at 1st and 2nd floor precast column enclosures around building perimeter