Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Work Order Number
Untitled Page
(T)ools, (S)afety Equipment and (M)aterials
-
Mechanic's tool set
-
Cleaning materials and equipment
-
Oiler
-
Filter replacement
-
Vacuum
-
Ladder
-
Biocide strips
Safety Guidelines
-
Schedule work with operating personnel
-
Follow site safety rules for lockout and tagout
-
Check with operating or area personnel for deficiencies
-
Review and follow the manufacturer’s instructions
-
Follow safety and environmental procedures for handling refrigerants (DX units only)
-
Record results in the equipment history log
-
Cover all exposed surfaces before moving ceiling tiles
-
Protect ceiling tiles and grids from damage and dirt
Maintenance Procedures
-
Check unit for noise and vibration
-
Inspect and clean washable filters if dirty. Recharge wire mesh filters with oil when applicable
-
Inspect and replace disposable filters when dirty
-
Damp wipe exterior surfaces
-
Renew condensate pan biocide strips
-
Clean surrounding floor area, and remove any dirt and debris from work area
Maintenance Hours
-
Time spent on work order?