(T)ools, (S)afety Equipment and (M)aterials
-
Electrician’s toolset
-
Multimeter
-
Infrared test set
-
Relay timing test set
-
Scotchbrite or very fine emery cloth
-
Battery impedance tester
-
Filters
-
Cleaning material and touch up paint
Safety Guidelines
-
High voltage is present inside the uninterruptible power supply cabinet even when disconnected from the power supply. Use caution when working with energized circuits
-
Follow the site safety rules and your supervisor's instructions
-
Schedule the work with the users
-
Review the manufacturer’s procedures
-
Report any problems you find
-
Record the results in the maintenance log
Maintenance Procedures
-
Tag out unit and ensure all circuits are dead
-
Remove covers and look for signs of overheating, cracks, or looseness
-
Inspect contactor/transfer switch contacts. Clean with scotchbrite or very fine emery cloth as required
-
Check batteries and battery connections for leaks, overheating, or corrosion. Clean and tighten as necessary
-
Complete a battery impedance test
-
Clean air intakes. Clean or replace air filters
-
Test undervoltage relay. The relay should operate at 90% (+ or - 2.5%) of rated voltage. Calibrate the guidance. Record the "as left" pickup voltage
-
Test Meters. Meters should operate within + or - 2.5% of scale. Calibrate if needed
-
Test all circuit breakers. Recalibrate trip and close settings as required
-
Replace indicating lamps, etc as needed
-
Perform spot cleaning and touchup painting as needed
-
Remove tags
-
Reconnect unit to load
-
Perform an operational test by simulating a power failure and checking for proper switching. Verify parameters
-
Return the unit to standby mode
-
Record the battery voltage and trickle charge rate
-
Record undervoltage relay as left pick-up
-
Record as found and as left meter readings
-
Record load test parameters
-
Record battery voltage and trickle charge in standby mode
-
Evaluate the battery for replacement
Maintenance Hours
-
How many hours was spent on this work order?