Information
-
Project inspection title:
-
Document serial number:
-
Client:
-
Conducted on:
-
Report prepared by:
-
Site address:
-
Contractors on site:
-
Brief summary of works being carried out on site at time of inspection:
PREVIOUS SITE INSPECTION
-
Has the site received a previous site inspection?
-
Have all non compliances been rectified
SITE DOCUMENTATION
-
Is there a version of the Construction Phase Plan in place on site?
-
Is the F10 displayed and on site?
-
Is a Design Risk Assessment available and up to date
-
Is here a Project Risk Assessment (Part of the CPP)
-
Is there a current induction register on site and up to date?
-
Is the signing in sheet up to date?
-
Is there an up to date PUWER register held on site?
-
Is there an up to date LOLER register held on site?
-
Is there the appropriate test certification for hired and fixed plant held on site?
-
Is there a current Traffic Management Plan in place?
-
Is there an Emergency Evacuation Plan in place ?
-
Are all operatives training records up to date and held on site?
-
Is there a copy of the Company Health and Safety Policy on display, signed and dated?
-
Are insurance certificates on display Employee / Public liability? (and in date)
-
Is there a current completed Health and Safety Law Poster on display?
-
Is there a copy of the Company Environmental Policy on display, signed and dated?
-
Additional comments on the section are:
COMMUNICATIONS
-
Has the site received any visits by the Health and Safety Executive, Local Authority or Environmental Agency?
-
Has the site received any complaints from neighbours?
-
Additional comments on this section are:
SITE WELFARE FACILITIES
-
Is there a suitable canteen / rest area?
-
Are there adequate seating arrangements provided?
-
Are facilities provided for the heating of food?
-
Is there running hot and cold water?
-
Is there an adequate drying / changing room?
-
Is the canteen clean and tidy?
-
Additional comments on this section are:
ACCIDENTS AND INCIDENTS
-
Have any accidents or incidents occurred on site?
-
Are AINM trends being recorded
-
Additional comments on this section are:
SANITARY FACILITIES
-
Is there male and female (lockable) facilities provided?
-
Is there adequate running hot and cold water?
-
Is there adequate facilities for drying your hands (paper towels, hand dryer)?
-
Are the toilet areas clean and adequately equipped?
-
Are barrier creams provided?
-
Additional comments on this section are:
SITE SIGNAGE
-
Are adequate warning notices displayed on the site boundary?
-
Is there an internal safety board displaying notices?
-
Are site rules on display?
-
Additional comments on this section are:
WORK AREAS
-
Are works areas clear and tidy
-
Are work activities being managed safely?
-
Are trailing leads being managed (trip hazards) ?
-
Are suitable dust control measures in place, (I.e. dampening down during sweeping, dust extractor fitted to cutting equipment)?
-
Is the standard of housekeeping acceptable?
-
Is there adequate storage facilities for materials?
-
Are suitable and sufficient Risk Assessments and Method Statements in place for activities being carried out?
-
Are permits issued and recorded (hot works, electrical distribution board)?
-
Additional comments on this section are:
WORK EQUIPMENT
-
Is appropriate access equipment being used for work at height?
-
Is there a fixed scaffold on site?
-
Are 7 day inspections being carried out, with a report supplied within 24 hours and filed on site?
-
Are there mobile scaffolds on site?
-
Is evidence available to show it has been erected and inspected by a PASMA trained operative?
-
Has Mechanical Access Equipment been considered
-
Is there evidence of PAT testing for portable electrical equipment?
-
Additional comments on this section are:
COSHH
-
Are hazardous substances being used on site?
-
Are hazardous substances properly stored?
-
Are Material Safety Data Sheets, and COSHH Assessments on site to accompany substances being used? By products from work activities been assessed and controlled properly
-
Additional comments on this section are:
ASBESTOS
-
Has an asbestos refurbishment / demolition survey been carried out?
-
Is a copy of the asbestos report on site for review by contractors?
-
Have contractors undertaken asbestos awareness training?
-
Additional comments on this section are:
MANUAL HANDLING
-
Have manual handling tasks been properly assessed?
-
Additional comments on this section are:
PERSONAL PROTECTIVE EQUIPMENT
-
Are all site personnel compliant with the site required PPE/RPE
-
Is the PPE/RPE being worn adequate and suitable for the purpose?
-
Additional comments on this section are:
FIRE SAFETY
-
Has a site fire risk assessment been carried out?
-
Is there an up to date Fire Evacuation Plan on display (muster point)?
-
Are fire escapes, alarms and walkways adequately signed and identified?
-
Are appropriate and sufficient site fire extinguishers available
-
Have fire extinguishers been inspected within last 12 months?
-
Is site combustible waste being appropriately managed?
-
Do contractors have fire extinguishers to hand where hot works are being carried out?
-
Additional comments on this section are:
FIRST AID PROVISION
-
Are first aider contact details available on site notice board?
-
Is a suitable stocked first aid kit on site?
-
Is a site accident book on site?
-
Additional comments on this section are:
SITE SECURITY
-
Are site access points appropriately managed?
-
Is site boundary adequately protected?
-
Additional comments on this section are:
TRAINING
-
Does the Site Representative hold a relevant qualification
-
Have any toolbox talks been carried out?
-
Additional comments on this section are:
ENVIRONMENTAL
-
Does the site have a Site Waste Management Plan in place.
-
Is waste appropriately segregated on site?
-
Are waste transfer and / or consignment notes recorded on site?
-
Are the above correctly completed?
-
Are spill kits in place?
-
If applicable, are there controls to reduce run off to surface water?
-
Are paints and varnishes water based?
-
Additional comments on this section are:
-
Principal Designer Advisor Audit Overview
-
Principal Designer Advisor
-
Site Team Representative