Audit

Select date
Sort

All items are in their designated place

There are no unused items, materials, equipment etc. in the area

There is no outdated information, posters etc. in the area

All walkways, exits and safety zones are clear of obstructions

Set in Order

All item places are clearly demarcated and labelled

All containers are correctly labelled and stored

All consumables, PPE etc. have min / max limits and are within these limits

Shine

The building walls, floors, windows etc. are clean and in good repair

All items and equipment in the area are clean and in good repair

The area is free from any rubbish, bins are adequate and not overflowing

Standardise

Area 6S Standards are in place and up to date

All product storage / contact items are stored properly

All PPE is stored properly

All staff are following PPE and GMP policy (correct PPE, uniform, clean shaven etc.)

No paperwork or process deviations observed during the 6S audit

Sustain

The 6S audit roster is posted and up to date

The 6S area map is posted and up to date

The 6S action list is displayed in the area and there are no overdue actions

The 6S result chart is up to date

The 6S target has been achieved

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.