Title Page
Quality Assurance Ride Along- Hello Garage Production
-
Team Leader
- Brandon
- Dillon
- Jeff
- Tony
- Larry
- Kevin
- Jordan
- Trinidy
-
Customer Name
-
Conducted on
-
Prepared by
- Dan
- Todd
- Sierra
- Kevin
- Kraig
- Nick
- Bryan
- Jeremiah
-
Hello Garage Location
Production QA
Arrive
-
Hello Garage attire
-
On-The-Way Call
-
Before Pictures
-
Introduction
-
Yard sign (marketing content)
-
General Feedback: Arrive
Prepare, Grind & Clean
-
Plastic work area
-
Equipment is on schedule for Maintenace and batteries charged
-
Grinding the work area done correctly
-
Proper crack chasing
-
Proper crack repair (all damage repaired)
-
Proper Vacuum
-
Proper Mopping
-
General Feedback: Prepare, Grind & Clean
Base Coat & Flake
-
Proper mixing station
-
Cleats clean
-
Squeegee property
-
Proper basecoat rolling
-
Clean work area (walls, drive, etc.)
-
General Feedback: Base Coat & Flake
Customer update & marketing material
-
Door hangers
-
Customer status update
-
General Feedback: Customer update & marketing material
Reclaim & Top Coat
-
Proper scraping
-
Clean up and weigh excess flake
-
Rolling top coat both directions
-
Clean finish
-
General Feedback: Reclaim & Top Coat
Storage & Organization
-
Installed to standard
-
Clean items after install
-
Place HG plates
-
Add additional protection
-
General Feedback: Storage & Organization
Complete Installation
-
Clean work area
-
All tools are in truck
-
All materials are logged prior to leaving jobsite
-
Final walk through
-
Collect Final Payment & record
-
Ask for 5-star reviews with podium link
-
Ask for referrals
-
Clean truck and prepare for tomorrow
-
Invoice customer
-
General Feedback: Complete Installation
undefined
-
Name 1-3 areas that the crew excelled on this project.
-
Name 1-3 areas that this crew could improve.
-
List any homework, assign, and due date.