Information

  • Job No.

  • Claim Stage

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Earthworks

  • Do you have a complete site file

  • Is the site cut complete

  • Is the site a combination of cut & fill

  • Are site fences in place

  • Please take photograph (incl lot no. Sign) for quality control

  • Level compacted site ready for footings

  • Emailed to Wahlstedt Quality Homes Office

  • Enter date & time emailed to office

  • Site Supervisor Signature

Footings

  • Excavation of trenches / depth & width correct

  • Installation of underfloor plumbing & services

  • Supervisor to check under plumbing & slab set out

  • Call up of engineer inspections

  • Concrete pour complete

  • STAGE COMPLETE DATE & PHOTOGRAPHS

  • Please take photograph

  • Emailed to Wahlstedt Quality Homes Office

  • Enter date & time emailed to office

  • Site Supervisor Signature

Wall & Roof Frame

  • Frames & trusses installed

  • Wall & roof frame check list complete

  • *Windows installed

  • SUBSTANTIAL COMPLETION OF PROGRESS STAGE READY TO PROCEED ON

  • Please take photograph

  • Emailed to Wahlstedt Quality Homes Office

  • Enter date & time emailed to office

  • Site Supervisor Signature

Brickwork & Roof Cover

  • *External door frames and doors installed

  • Roof, fascia and gutter install

  • *Hot & cold plumbing pipe work install

  • *1st fix electrical install

  • Brick laying / cladding complete

  • *Garage door and or garage door to house installed

  • SUBSTANTIAL COMPLETION OF PROGRESS STAGE READY TO PROCEED ON

  • Please take photograph

  • Emailed to Wahlstedt Quality Homes Office

  • Enter date & time emailed to office

  • Site Supervisor Signature

Internal Linings

  • Installation of plasterboard

  • *Flush & sand of plasterboard

  • *Install of bath (if applicable)

  • SUBSTANTIAL COMPLETION OF PROGRESS STAGE READY TO PROCEED ON

  • Please take photograph

  • Emailed to Wahlstedt Quality Homes Office

  • Enter date & time emailed to office

  • Site Supervisor Signature

2nd Fix Carpentry & Cabinets

  • *Waterproofing complete

  • Internal doors, skirtings & architraves

  • Install kitchen / vanities and shelving

  • SUBSTANTIAL COMPLETION OF PROGRESS STAGE READY TO PROCEED ON

  • Please take photograph

  • Emailed to Wahlstedt Quality Homes Office

  • Enter date & time emailed to office

  • Site Supervisor Signature

Practical Completion

  • Installation of tiling

  • Painting

  • 2nd fix electrical

  • 2nd fix plumbing

  • Shower screens & mirrors

  • Paths & driveways & landscaping (if applicable)

  • This house meets Wahlstedt Quality Homes procedures and is ready for Practical Completion

  • STAGE COMPLETE DATE & PHOTOGRAPHS

  • Please take photograph

  • Emailed to Wahlstedt Quality Homes Office

  • Enter date & time emailed to office

  • Site Supervisor Signature

  • *These items are not required by contract to be completed for the progress claim to be paid. They are listed as a reference guide only.

    This document is designed to inform our clients when there home reaches the progress stages in the contract.

    Always refer to signed contract documents for detailed clarification.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.