Information
-
Job No.
-
Claim Stage
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Earthworks
-
Do you have a complete site file
-
Is the site cut complete
-
Is the site a combination of cut & fill
-
Are site fences in place
-
Please take photograph (incl lot no. Sign) for quality control
-
Level compacted site ready for footings
-
Emailed to Wahlstedt Quality Homes Office
-
Enter date & time emailed to office
-
Site Supervisor Signature
Footings
-
Excavation of trenches / depth & width correct
-
Installation of underfloor plumbing & services
-
Supervisor to check under plumbing & slab set out
-
Call up of engineer inspections
-
Concrete pour complete
-
STAGE COMPLETE DATE & PHOTOGRAPHS
-
Please take photograph
-
Emailed to Wahlstedt Quality Homes Office
-
Enter date & time emailed to office
-
Site Supervisor Signature
Wall & Roof Frame
-
Frames & trusses installed
-
Wall & roof frame check list complete
-
*Windows installed
-
SUBSTANTIAL COMPLETION OF PROGRESS STAGE READY TO PROCEED ON
-
Please take photograph
-
Emailed to Wahlstedt Quality Homes Office
-
Enter date & time emailed to office
-
Site Supervisor Signature
Brickwork & Roof Cover
-
*External door frames and doors installed
-
Roof, fascia and gutter install
-
*Hot & cold plumbing pipe work install
-
*1st fix electrical install
-
Brick laying / cladding complete
-
*Garage door and or garage door to house installed
-
SUBSTANTIAL COMPLETION OF PROGRESS STAGE READY TO PROCEED ON
-
Please take photograph
-
Emailed to Wahlstedt Quality Homes Office
-
Enter date & time emailed to office
-
Site Supervisor Signature
Internal Linings
-
Installation of plasterboard
-
*Flush & sand of plasterboard
-
*Install of bath (if applicable)
-
SUBSTANTIAL COMPLETION OF PROGRESS STAGE READY TO PROCEED ON
-
Please take photograph
-
Emailed to Wahlstedt Quality Homes Office
-
Enter date & time emailed to office
-
Site Supervisor Signature
2nd Fix Carpentry & Cabinets
-
*Waterproofing complete
-
Internal doors, skirtings & architraves
-
Install kitchen / vanities and shelving
-
SUBSTANTIAL COMPLETION OF PROGRESS STAGE READY TO PROCEED ON
-
Please take photograph
-
Emailed to Wahlstedt Quality Homes Office
-
Enter date & time emailed to office
-
Site Supervisor Signature
Practical Completion
-
Installation of tiling
-
Painting
-
2nd fix electrical
-
2nd fix plumbing
-
Shower screens & mirrors
-
Paths & driveways & landscaping (if applicable)
-
This house meets Wahlstedt Quality Homes procedures and is ready for Practical Completion
-
STAGE COMPLETE DATE & PHOTOGRAPHS
-
Please take photograph
-
Emailed to Wahlstedt Quality Homes Office
-
Enter date & time emailed to office
-
Site Supervisor Signature
-
*These items are not required by contract to be completed for the progress claim to be paid. They are listed as a reference guide only.
This document is designed to inform our clients when there home reaches the progress stages in the contract.
Always refer to signed contract documents for detailed clarification.