Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
PROGRESS STAGE
- Deposit
- Excavations Complete
- Drainage
- Slab on Ground
- Piling
- Timber Ground Floor
- Ground Floor Framing
- Midfloor Framing
- Structural Steel
- Top Floor Framing
- Roof Framing/Trusses
- Roof/Fascia/Gutter
- Cladding
- Windows/Doors
- Prehung Doors
- Pre-Wire
- Pre-Pipe
- Interior Linings
- Exterior Painting
- Interior Painting
- Floor Coverings
- Joinery
- Tiling
- Practical Completion
- Handover
- Other (please specify)
-
NEXT MILESTONE
- Deposit
- Excavations Complete
- Drainage
- Slab on Ground
- Piling
- Timber Ground Floor
- Ground Floor Framing
- Midfloor Framing
- Structural Steel
- Top Floor Framing
- Roof Framing/Trusses
- Roof/Fascia/Gutter
- Cladding
- Windows/Doors
- Prehung Doors
- Pre-Wire
- Pre-Pipe
- Interior Linings
- Exterior Painting
- Interior Painting
- Floor Coverings
- Joinery
- Tiling
- Practical Completion
- Handover
- Other (please specify)
-
MILESTONE COMPLETION.
-
MILESTONE VALUE
- $0 - $10k
- $10 - $25
- $25 - $50k
- $50 - $75k
- $75 - $100k
- $100 - $125k
- $125 - $150k
- $150k - Higher
-
ENVIRONMENTAL CONDITIONS.
- Sunshine
- Over cast
- Rain
- Gale force winds
- Frost
- Snow
-
OBSERVATIONS
-
Photograph
-
ARE THERE ANY VARIATIONS? (If no provide detail below)
- Yes
- No
-
Variation Details.
-
Can work continue onsite? (If no provide detail below)
- Yes
- No
-
Photograph
-
ANY INFORMATION REQUIRED FROM CLIENT?
-
ANY INFORMATION REQUIRED FROM OTHERS?
(Architect, Engineer, Sub-contractor) -
HEALTH AND SAFETY
-
ARE THERE ANY HEALTH AND SAFETY CONCERNS? (if yes please state)
- Yes
- No
-
Photograph
-
Office Use Only
-
Avon Dickie Construction Manager