Title Page
-
Project Name
-
Date of Inspection
-
Inspection Completed By
-
Location
-
Others Involved
Executive Summary
-
undefined
Documentation
Documentation
-
In date F10 notification on display for all to view?
-
IFPC HSE noticeboard available? Does this display valid insurances, A&E location map, What3Words reference, First aid details, Project KPI's
-
Is the Construction Phase H&S plan available in the site office?
-
When was the CPP last reviewed / updated and by who?
-
Is the Project Environmental Management Plan available?
-
When was the EMP last reviewed / updated and by who?
-
Has all sensitive information (induction records, D&A information, incident reports etc) securely kept in line with the IFPC GDPR policy ?
-
Are all activities observed on the day covered by a suitable and sufficient risk assessment and method statement?
-
Which activity was reviewed during this inspection?
Fire & Emergency (Documentation)
-
Is there a suitable fire risk assessment in place for the construction phase?
-
When was this produced/ last updated?
-
Has the project got a fire and emergency plan in place which clearly identifies roles and responsibilities, and emergency contacts?
-
When was this produced/ last reviewed?
-
Is there evidence of weekly inspections of fire and emergency equipment available and up to date?
-
When was the last emergency evacuation drill carried out on the project?
-
Is there evidence available to show weekly tests are being undertaken on the fire alarm system?
-
Is there adequate number of first aiders on site?
-
Who is the named first aider on site?
-
Is evidence of first aid training available on the project?
-
Are the details of the first aiders and first aid box location available in a prominent location for all to view?
Site Access & Security
Site Access & Security
-
Is the public appearance up to a good standard including no evidence of waste being blown off site?
-
Is there segregated vehicle and pedestrian access routes onto the project?
-
Are pedestrian routes in good condition, free from slip and trip hazards?
-
Has the project got facilities to ensure all contractors, staff and visitors are signed on and off of the project (biometrics, security guard, receptionist etc.)?
-
Is there adequate signage on the perimeter to warn the public of the dangers of construction sites?
-
Is there suitable directional signage to easily identify the project and entrances etc?
-
Is there emergency out of hours contact details clearly displayed for the public to see?
-
Office & Welfare
Office & Welfare
-
Is the office in a clean and tidy condition with no trip hazards evident (including entrance and exits)?
-
Is the standard of lighting and ventilation within the office / welfare adequate?
-
Has all portable electrical equipment undergone a portable appliance test (PAT) within the last 12 months?
-
When was the last portable appliance test carried out?
-
Has any temporary accommodation been electrically tested since delivery and installation? Provide evidence of the test certificate
-
Are ignition sources such as heaters free from the risk of combustible materials?
-
Have DSE assessments been carried out for display screen users?
-
Does the canteen have a kettle (or similar), fridge, microwave, hot and cold water suitable for drinking and cleaning?
-
Is the equipment and facilities suitable for the number of contractors on site?
-
Is the canteen and welfare facilities in good clean condition?
Work Area Safety
Work Area Safety
-
Are the ground conditions under foot suitable and safe for works to continue?
-
Is the safety and emergency escape lighting levels adequate (inc. stairwells)?
-
Is adequate task lighting being used by contractors for the task activity?
-
Are pedestrian routes adequately segregated from plant and vehicle routes?
-
Is there adequate work area segregation to protect others not involved with the task?
-
Is the level of housekeeping to a good standard to eliminate slip & trip hazards?
-
Are materials and equipment stored safely to prevent damage or injury?
-
Are material storage areas clearly designated and identifiable to each contractor?
Personal Protective Equipment (PPE)
PPE
-
Compliance to IFPC mandatory 5 points of PPE
-
Is PPE in good condition?
-
Task specific PPE identified within risk assessments?
-
Has face fit testing been carried out where RPE is being used?
-
Are operatives using RPE clean shaven and wearing it correctly?
-
Is task specific PPE being worn as identified within the risk assessment
Health Hazards & COSHH
Health Hazards & COSHH
-
Are activities that produce dust adequately controlled in line with the hierarchy of control?
-
Are activities that expose the user to vibration adequately controlled?
-
Are operatives that use the equipment aware of the exposure limits (time permitted on the tool)?
-
Are activities and tasks that produce noise identified in contractors risk assessments, with a suitable noise assessment completed?
-
Is there suitable controls in place to manage and inform others of noisy activities on site?
-
Have manual handling risk been identified by the contractors as part of their risk assessment process?
-
Are the controls in place as per the risk assessment being followed on site and do these follow the hierarchy of control?
-
Are there COSHH assessments available for all substances being used or stored on the project?
-
Are chemicals and substances stored in line with the manufacturers instructions and associated COSHH assessment?
-
Are the control measures identified within the COSHH assessment being followed (including suitable PPE)?
-
Is there suitable sized spill kits available and are these suitably stocked and positioned for quick access?
-
Are there suitable means available for the safe disposal of COSHH items including used spill kits etc?
-
Is this separate from other waste streams to prevent contamination?
Housekeeping
Housekeeping
-
Is the general housekeeping standards around the project in good order and to IFPC expectations?
-
Are storage areas clearly defined and segregated?
-
Are temporary power cables and extension leads routed to eliminate risk to others (at height, not across doorways, away from stairs etc.)?
-
Are hoses (water, concrete pump, sump pump etc.) routed, highlighted and protected to prevent risk to others?
Breaking Ground
Breaking Ground
-
Does the project have up to date underground service drawings and a GPR survey carried out within 3 months of the project starting?
-
Is the provider of the GPR survey a member of The Survey Association?
-
Has the Permit to Break Ground part 1 been completed to help positively identify all known services in the area of excavation works (inc trial holes)?
-
Has the Permit to Break Ground part 2 been completed, briefed and signed by all parties involved in the task?
-
Is there an up to date service drawing available with the permit clearly showing the permitted area and limitations of the activity?
-
Is there a copy of the permit to break ground and drawing available with the operatives undertaking the task as well as displayed on the permit board within the office?
-
-
Is there a CAT & Genny available at the location of the excavation works?
-
Provide evidence of the calibration date of the CAT & Genny being used.
-
Are operatives wearing FR overalls and using insulated hand tools when digging around known live services?
-
Is there adequate benching or shoring of the excavation sides to prevent collapse as per the temporary works design?
-
Is the access arrangements into excavations adequate (stepped, ramped, proprietary platform & ladder)?
-
Is proprietary shoring equipment installed correctly with adequate edge protection, no gaps down the external sides of the frame, not riding the excavation (resting at the base of the excavation), no unsupported excavation edges at front and rear?
Work at Height - Access Equipment
MEWPS
-
Do MEWPs on site have a valid, in date certificate of thorough examination?
-
Are MEWP operators trained in the use of the plant and able to provide a valid training certificate?
-
Is there a suitable MEWP rescue plan in place for the work at height activity?
-
Do mobile booms (Cherry Pickers) have secondary protection systems in place to prevent entrapment?
Tower Scaffolds
-
Are mobile tower scaffolds erected in accordance with the manufacturers instructions?
-
Are all components in good condition with no visible signs of damage?
-
Is there an in date mobile tower scaffold inspection tag on display and dated within the last 7 days?
-
Has the tower scaffold been erected by a trained and competent person?
-
Is the height to base ratio in line with the manufacturers guidelines and has suitable outriggers been installed where required?
-
Have suitable outriggers been installed where required and set to provide maximum stability?
Podium Steps
-
Are podium steps compliant to PAS250 and of an anti-surf design?
-
Are the handrails set to the correct height for the platform level to ensure correct edge protection is available?
-
Have the podiums been inspected and display an in date inspection tag within the last 7 days?
-
Are wheels locked when the podium is in use?
-
Are stabilisers installed where required by the manufactures instructions?
-
Does the podium have a self closing gate installed?
-
Is the gate able to close effectively and freely?
Hop Up's
-
Is there evidence of a recent inspection having been carried out on the Hop Up (Inspection Tag)?
-
Are hop ups being use in good condition?
-
Do hop ups have a minimum of 600mm X 600mm working platform?
-
Are the legs securely locked in the open position when the hop up is in use?
PAV
-
Has a daily inspection been completed for the PAV's checked during this audit?
-
Is there an in date Certificate of Thorough Examination available for the PAV's checked during the audit?
-
Has an adequate restriction zone been implemented around the PAV in use?
-
Are the wheels locked when in use to prevent movement?
Work at Height - Scaffold
Work @ Height - Scaffold
-
Is the scaffold erected to a TG20 compliant design?
-
Is there a site specific TG20 compliance sheet available on site?
-
Is there bespoke designs in place for scaffolds that fall outside of the scope of a standard TG20 design?
-
Have all scaffold designs been reviewed by the temporary works coordinator and included on the temporary works register?
-
Is there a completed handover certificate available for the scaffold structures in use?
-
Has a written 7 day inspection been completed by a competent person and provided to the client?
-
Is there a easily accessible and visible ScaffTag completed (within 7 days) for the structures?
-
Has a suitable restriction zone been created around scaffolds being erected/ altered/ dismantled to prevent others entering the hazardous area?
-
Are the Scaffolders using tool tethers whilst erecting/ altering /dismantling scaffolds?
-
Are the Scaffolders compliant to the requirements of SG4:15 and ensuring suitable fall protection is available at all times (fully boarded lift with single handrail)?
-
General condition of the scaffold structure in use (ladder security, scaffold components, board condition, brick guards)?
-
Do all loading bays have up and over gates that provide a secondary guardrail when open?
-
Do all loading bays display a clear to understand SWL sign in direct line of sight for the forklift/ loader?
Fire and Emergency (inc. Hot Work Activities)
Fire & Emergency
-
Is there suitable fire fighting equipment available on the project?
-
Is the fire fighting equipment easily accessible?
-
Has the fire fighting equipment been inspected within the last 12 months?
-
When was the last inspection completed?
-
Are the fire call points easily identifiable and positioned on escape routes?
Hot Work Activities
-
Has a HWP been fully completed and issued to the operative undertaking the hot work activity, is this available at the point of work?
-
Is there 2 suitable fire extinguishers at the point of work?
-
Is the hot work area suitably segregated from other work activities to protect others?
-
Is the area free from combustible materials, or protected with LPS1207 temporary coverings if materials can not be moved?
First Aid
-
-
Is there adequate first aid provisions on site for the number of people on the project?
-
Is the first aid equipment location easily identifiable, and contents within date?
-
Is the first aid equipment (inc. eye wash) within its expiry date?
Plant & Equipment
Plant & Equipment
-
Are certificates of thorough examination available for plant checked during this audit?
-
Is evidence available to show that daily inspections of plant are taking place at the start of a new shift?
-
Is there adequate segregation in place where plant and people are in close proximity?
-
Where 360 plant (including excavators) are operating, are people kept clear of the danger zones and blind spots?
-
Is all plant and equipment observed during this inspection in a good general state of repair?
-
Has all plant got an amber flashing warning light in good working order?
-
Has ROPS / FOPS been installed on plant where required, and is it in good / usable condition at the time of the inspection?
-
Does all plant inspected have seatbelts available and being used by the plant operatives?
-
Do all portable electrical items show evidence of a portable appliance test (PAT) having been carried out within the last 3 months?
-
Has all of the site temporary electrical equipment been tested within the last 3 months with certificates available?
-
Does all plant, tools and machinery have suitable guards fitted where required?
-
Other observations
Lifting Operations & LOLER
Lifting Operations & LOLER
-
Has a specific lift plan been produced for the activity and all parties involved briefed on the content?
-
Has a lift permit been issued and signed by all parties involved?
-
Is there evidence of certificates of thorough examination in place for lifting equipment being used on the project?
-
Are all lifting operations suitably segregated to prevent access by others not involved?
-
Is the training and competency
Confined Space
Confined Space
Waste Management
Waste Management
-
Is waste being allowed to accumulate around the project?
-
Is there suitable means for disposal of construction waste i.e segregated skips, bins, containers?
-
Are the skips labelled to clearly identify the different waste streams permitted?
-
Are the skips and other waste collection points kept 6m from buildings and boundary fence lines adjacent to public areas? Keeping these away from boundary fence lines can help reduce the risk of arson.
Environmental
Environmental
Sign Off
-
Add signature