Project - Administration
-
Is perimeter site fencing in place sufficient to deter / prevent causal unauthorised access ?
-
Is signage erected at the main entry (eg Contact Details, WHS requirements ect) and other points of access tosite ?
-
Is the Project Safety management Plan onsite and current ?
-
Is the Site Office in a suitable location to monitor activities onsite and receive visitors ?
-
Are site amenities suitable for the expected workforce ?
-
Are daily sign-in sheets being completed by all workers and visitors ?
-
Are workers receiving Site Specific inductions before commencing work?
-
Are ToolBox Talks being held, Safety Notices being made available and site issues consulted on with workers ?
-
Are required site records and reports being kept up to date (Inductions, Personal contacts, Hazardous substances, Incidents and Injury reports etc) ?
-
Are Contractor's SWMS and SDS being held at the site office ?
-
Are there sufficient First Aid supplies,First Aid Training and emergency services contact / availability onsite ?
Site - General
-
Does the site appear in a general tidy, well managed state ?
-
Are roads and access ways well defined and being kept as clear as reasonably practicable?
-
Have environmental issues been addressed in a suitably sufficient manner (settlement ponds, swales, sediment fences, dust suppression etc) ?
-
Are rubbish collection and removal systems in place and sufficient to effectively deal with rubbish, debris and construction waste ?
-
Are there sufficient materials storage areas, placed in convenient locations (without hampering access and construction) ?
-
Are workers observing suitable PPE and HiVis clothing requirements ?
Hazards
-
Are major hazards being identified and controlled on site ?
-
Are excavations being protected and not left unattended ?
-
Have any overhead electrical powerlines potentially affecting the site (perimeter or internally) been identified and risk assessed ?
-
Are fall risks being identified and controlled ?
-
Is Scaffold provided for access and work platforms being reinspected every 30 days ?
-
Is traffic separation being suitably address to control risk to workers and others ?
Mobile Plant
-
Are Registration, Licencing (where applicable), maintenance and test records being carried and available for inspection ?
-
Does mobile plant appear to be in good order, set up and operated correctly / competently ?
-
Are warning Beacons (flashing lights, reversing beepers etc) fitted and operational on mobile plant ?
Electrical
-
Are Meter Boxes provided for construction power AS3012 (Construction Power) compliant, tested by an electrician every three months and trip-tested monthly ?
-
Are electrical items and site shed power tested in accordance with AS3012 requirements ?
-