Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
GENERAL
TRAINING & PLANNING
-
Copy of current Tishman Safety manual on site
-
Have all new hires completed the new hire orientation?
-
Weekly tool box meeting held and documented ?
-
Copy of contractor job specific Safety plan on site and up to date?
-
Emergency evacuation plan in place?
-
Job Hazard Analysis completed and adequate for tasks being performed?
MEDICAL & FIRST AID
-
Are contractor employees trained in first aid/CPR on site?
-
Are first aid supplies adequate?
POSTING & RECORDKEEPING
-
OSHA 300 form being completed/posted?
-
Safety and health poster posted?
-
Emergency telephone numbers posted?
-
Medical clinic directions posted?
HAZARD COMMUNICATION/MSDS
-
Copy of contractor written program
-
Contractor employees trained?
-
Safety Data Sheets current for all contractors on site
-
Labels on containers
PUBLIC PROTECTION
-
Public protection adequate including warning signs?
HOUSEKEEPING & SANITATION
-
Housekeeping: aisles clean, scrap removed, no protruding nails.
-
Adequate supply of water or water jugs, cups and trash containers?
-
Adequate toilet facilities and clean?
PERSONAL PROTECTIVE & LIFE SAVING EQUIPMENT
-
Head,eye, face, and hand protection worn?
-
Respiratory protection worn when needed/required?
-
Written program:<br>medical evaluations completed?<br>Documentation of fit test and training for respirators?
-
Safety harnesses, lifelines and lanyard worn when needed/required?
FIRE PROTECTION & PREVENTION
-
Fire extinguishers/stand pipe installed<br>clear access?<br>Fire extinguishers identified, charged and inspected monthly?
-
Flammable & combustible liquids in approved containers only?
-
"No smoking" posted and enforced where needed?
-
Fuel tanks protected and min 20 ft from bldgs w/ 20B fire exiting w/in 50 ft?
ELECTRICAL
-
Guarding of live parts by cabinets or other enclosures?
-
Warning signs posted (Danger high voltage)?
-
GFCI receptacle used including when using permanent power?
-
GFCI's tested w/ test documented?
-
Temporary lighting adequate and bulbs protected?
-
Breaker boxes and switches properly labeled?
-
Lockout/Tagout being used?
-
Extension cords in good condition?
TOOLS
-
Proper tool being used for job?
-
All tools inspected at least daily?
-
Damaged tools repaired or replaced promptly?
-
Are tools being used properly?
-
Guards in place?
-
Pneumatic tools/air hoses have proper safeguards, secured connections?<br>
-
Powder Actuated Tools:<br>Operators trained/spot check cards?<br>Tools and charges protected from unauthorized use?
STAIRWAYS AND LADDERS
-
Stairway/ladder/ramp used where 19 inch break in elev.
-
Stairways clean and free of trip hazards w/ adequate lighting?
-
Handrails in stairways and guardrails at landing?
-
Ladders properly secured to prevent slipping, sliding or falling?
-
Do straight ladders extend 36" above top of landing?
-
Offset protection at top ladder entrance?
-
Stepladders fully open when in use; no standing on top two steps?
-
Proper maintenance and storage of ladders?
SCAFFOLDING
-
Is scaffold equipment in good working order?
-
Inspected by competent person daily before use?
-
Erected on solid, level footing?
-
Guardrails on open sided and end more than 6 ft above the ground?
-
2x4 top rail, mid-rail & toe board?
-
Tightly planked platform for full width and secured in place?
-
Is the scaffold plump and square, with cross-bracing?
-
Access ladder provided?
-
Maximum height = four (4) times minimum base diminsion?
-
Suspended scaffold
-
Hooks, clamps, outriggers properly anchored and tiebacks installed?
-
Counterweights attached to outriggers with weights marked?
-
Tiebacks have rigging thimble with loop, secured with min. 3 fist grip clamps?
-
Independent lifeline for each worker on platform, rope protected abrasion?
FALL PROTECTION
-
Floor opening covered/guardrails in place?
-
Open-sided floors/wall opening have guardrails & toe boards?
-
Roof edge adequately guarded?
-
Leading edge protection & signage utilized where required?
-
100% fall tie off for all heights above 6 ft with proper anchor points?
AERIAL MANLIFTS/SCISSORS LIFTS
-
All personnel tied off?
-
Safety chains in place on scissors lifts?
-
Employee training verified?
HANDLING & STORAGE OF MATERIALS
-
Materials properly stored or stacked?
-
Are loads lifted correctly? Proper number of men or equipment used?
-
Material secured if high winds approaching?
-
Use trash chute for debris drop over 20 feet?
WELDING AND CUTTING/OTHER HOT WORK
-
Screens and shields used where necessary?
-
Goggles, gloves, proper clothing worn?
-
Electrical equipment grounded?
-
Welding leads and gases hoses protected and in good condition?
-
Fire extinguishers or proper type nearby?
-
Inspection of fire hazards?
-
Gas cylinders secured and upright. Fuel cylinders at least 20 ft from oxygen?
-
Are cylinder caps in use?
-
Fire watch used where needed/required?
COMMENTS & ADDITIONAL ITEMS
-
Item #1
-
Attachment #1
-
Item #2
-
Attachment #1
-
Item #3
-
Attachment #1
-
Item #4
-
Attachment #1
-
Item #5