Report

  • Conducted on

  • Conducted by

  • Location

  • Address

  • Wrekin Windows Job No

  • Add number of items installed

Internal Inspection

  • 1. Floor protection in place

  • 2. Existing frames carefully removed

  • 3. Frames installed square and level with fixings in the correct positions.

  • 4. DG units reglazed correctly using glazing packers.

  • 5. All cover caps and end caps fitted

  • 6. Frame and glass cleaned

  • 7. Trim and mastic finish

  • 8. Work area left clean and tidy

  • 9. Check operation of windows, doors, vents and gaskets. <br>

  • 10. Resident shown how to operate windows and provided with maintenance handbook

  • 11. Please confirm the windows to property are free from damages. (if no please provide details under the relevant location below)

Detailed information with the corresponding photos

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

  • Location of the installed product

Signed off

  • Installer's Comments

  • Accepted by resident

  • Signed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.