Information

  • Audit Title

  • Client / Site

  • Retail

  • Industrial

  • Office

  • Conducted on

  • Prepared by

Cleaning Inspection

  • Date of Last Inspection

  • Carried Out By:

  • Score

Condition of Property (Tick appropriate box)

  • Note: Limits of inspection may include access restrictions; visual inspection only; inspection from ground level etc. This is note a formal condition report or structural survey.

    Scoring (1) Satisfactory (2) Unsatisfactory. (3) N/A. (4) Not able to comment at time of inspection

  • Ceiling / Roofs / Walls

  • Internal

  • Add media

  • External

  • Add media

  • Windows / Doors

  • Internal

  • Add media

  • External

  • Add media

  • Pipe work / Guttering

  • Internal

  • Add media

  • External

  • Add media

  • Lift / M&E

  • Internal

  • Add media

  • External

  • Add media

  • Signage
    (Clear & Up to date)

  • Internal

  • Add media

  • External

  • Add media

  • Landscape / Boundaries

  • Internal

  • Add media

  • External

  • Add media

  • Fire Escape Routes clear

  • Internal

  • Add media

  • External

  • Add media

  • Pedestrian walkways

  • External

  • Add media

  • Estate Security

  • External

  • Add media

  • Road Surface

  • External

  • Add media

  • Notes

  • Add media

  • Vacant Units

  • Add media

General Observations

  • Are plant / boiler / electrical cupboards kept locked and free of combustable materials?

  • Is M&E Log on Site?

  • Is Cleaning Log on Site?

  • Is Security AI Log on Site?

  • Notes

  • Add media

  • Comment on Tenant Issues / Disputes / Complaints / Future requirements / General Feedback / Vacant space / Potentially vacant space

  • Comment on Property Issues in the Immediate vicinity e.g. letting boards, development activity etc.

Health & Safety

  • H&S Is the H&S Assessment document on site?<br>If No note further action to be taken:

  • Date of Assessment

  • Number of Risks outstanding:

  • Number of Risks outstanding from last inspection:

  • Number of Priority One items:

  • FRA Is Fire Risk Assessment on site?<br>If No note Further action to be taken:

  • Date of Assessment

  • Number of Risks outstanding:

  • Number of Risks outstanding from last inspection:

  • Number of Priority One items:

  • Notes

  • Add media

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.