Title Page

  • Completed forms are to be kept readily available (preferably on site) for the duration of construction works, after which time shall form part of the CDM Health & Safety File.

  • Sensible Monitoring Audit Completed By:

  • Site Manager:

  • Contract Number:

  • Project Title:

  • Conducted on

General

  • Any H&S actions identified shall be entered onto Audit / Inspection Action Log and brought to the urgent attention of the appropriate personnel as soon as possible. Contractor / Project Manager to be notified of actions required / taken.

  • 1) Is the public fenced off or otherwise protected from the work?

  • Comments:

  • Attach any images relevant to question 1 here.

  • 2) When work has stopped for the day are all gates secured?

  • Comments:

  • Attach any images relevant to question 2 here.

  • 3) Is the perimeter fencing secure and undamaged?

  • Comments:

  • Attach any images relevant to question 3 here.

  • 4) Are warning signs posted in conspicuous places around fencing?

  • Comments:

  • Attach any images relevant to question 4 here.

  • 5) Are all ladders removed or their rungs boarded so that they cannot be used?

  • Comments:

  • Attach any images relevant to question 5 here.

  • 6) Are excavations and openings securely covered or fenced off to prevent unauthorized access?

  • Comments:

  • Attach any images relevant to question 6 here.

  • 7) Is all plant immobilized to prevent unauthorized use?

  • Comments:

  • Attach any images relevant to question 7 here.

  • 8) Are material, tools and plant stored safely?

  • Comments:

  • Attach any images relevant to question 8 here.

  • 9) Are flammable or dangerous substances locked away in secure storage places?

  • Comments:

  • Attach any images relevant to question 9 here.

  • 10) Is rubbish cleared away or placed in locked skips at the end of each shift?<br>a) Are any items left of site which could be set fire to?

  • Comments:

  • Attach any images relevant to question 10 here.

  • 11) When site is closed down for long weekends and holidays does a manager tour and inspect the site prior to site closure?

  • Comments:

  • Attach any images relevant to question 11 here.

  • 12) Is adequate signage displayed on public roads warning on the construction activities (road crossings, pipe dumps, site entry etc.)?

  • Comments:

  • Attach any images relevant to question 12 here.

  • 13) Are all public rights of way near to an through the site identified and protected?<br>a) Are employees aware of these?

  • Comments:

  • Attach any images relevant to question 13 here.

Sign Off Audit

  • Print Name:

  • Signature:

  • Project Manager Name:

  • Signature:

  • Designation:

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.