Title Page
-
Completed forms are to be kept readily available (preferably on site) for the duration of construction works, after which time shall form part of the CDM Health & Safety File.
-
Sensible Monitoring Audit Completed By:
-
Site Manager:
-
Contract Number:
-
Project Title:
-
Conducted on
General
-
Any H&S actions identified shall be entered onto Audit / Inspection Action Log and brought to the urgent attention of the appropriate personnel as soon as possible. Contractor / Project Manager to be notified of actions required / taken.
-
1) Is the public fenced off or otherwise protected from the work?
-
Comments:
-
Attach any images relevant to question 1 here.
-
2) When work has stopped for the day are all gates secured?
-
Comments:
-
Attach any images relevant to question 2 here.
-
3) Is the perimeter fencing secure and undamaged?
-
Comments:
-
Attach any images relevant to question 3 here.
-
4) Are warning signs posted in conspicuous places around fencing?
-
Comments:
-
Attach any images relevant to question 4 here.
-
5) Are all ladders removed or their rungs boarded so that they cannot be used?
-
Comments:
-
Attach any images relevant to question 5 here.
-
6) Are excavations and openings securely covered or fenced off to prevent unauthorized access?
-
Comments:
-
Attach any images relevant to question 6 here.
-
7) Is all plant immobilized to prevent unauthorized use?
-
Comments:
-
Attach any images relevant to question 7 here.
-
8) Are material, tools and plant stored safely?
-
Comments:
-
Attach any images relevant to question 8 here.
-
9) Are flammable or dangerous substances locked away in secure storage places?
-
Comments:
-
Attach any images relevant to question 9 here.
-
10) Is rubbish cleared away or placed in locked skips at the end of each shift?<br>a) Are any items left of site which could be set fire to?
-
Comments:
-
Attach any images relevant to question 10 here.
-
11) When site is closed down for long weekends and holidays does a manager tour and inspect the site prior to site closure?
-
Comments:
-
Attach any images relevant to question 11 here.
-
12) Is adequate signage displayed on public roads warning on the construction activities (road crossings, pipe dumps, site entry etc.)?
-
Comments:
-
Attach any images relevant to question 12 here.
-
13) Are all public rights of way near to an through the site identified and protected?<br>a) Are employees aware of these?
-
Comments:
-
Attach any images relevant to question 13 here.
Sign Off Audit
-
Print Name:
-
Signature:
-
Project Manager Name:
-
Signature:
-
Designation:
-
Select date