Title Page

  • Site conducted

  • Conducted On

  • Prepared by

General Issues

  • Is the construction phase plan avaliable and in-date

  • All operatives signed on to relevent RAMS

  • Have all operatives on site been inducted

  • F10 clearly displayed and in date

  • All health had safety board up to date (i.e., H&S poster, incurances, emergancy details)

  • Appropriate safety signage avaliable for use. i.e., site rules, hazards etc.

  • Are all permits to work complete in full

  • Are all asbestos surveys on-site and aknowledgement sheet signed by all operatives

Emercency Procedures

  • All escape routes clear (with-in site compound)

  • Have all accidents been reported to head office

Site

  • Are all operatives working in accordance with there RAMS

  • Are all operatives wearing the appropriate PPE

  • Is good housekeeping being observed on site

  • Are harnesses in use when erecting/stripping scaffolding

  • Is scaffolding in good condition and free from defect

  • All scaffolding uprights provided on base plates

  • Are all scaffolding working platforms complete and clear from debris/obstruction

  • Is public protection inplace on scaffolding i.e., foam protection on standards

  • Are all incomplete scaffolding appropriatly signed

  • Are all ladders tied in good condition, tied and pass correct distance above working platform (1m or 3 rungs)

  • Is site waste being disposed of correctly and safely i.e., no bombing

  • Are the public protected from our day to day works i.e., overhead/door protection in place

  • It is the responsability of the operatives carrying out the works to ensure the public are protected from potential hazards that may arise from such works. i.e., it is not the scaffolders responsability to ensure overdoor protection is in place for the roofers, it is the roofers responsablily to protect the public from there works etc.

  • Are all operatives working with dust issued/own appropriate RPE

  • Are all operatives creating/working with dust using appropriate dampening/extraction

  • Are bankspersons used to control vehicle movements

  • Are all skips suitably protected

Summary

  • Any additional observations not stated previously

  • Any comments

Sign Off

  • All signiticant finding reported to the H&S department

  • Time & Date completed

  • Completed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.