Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Scheme

  • Audit No

CDM Site Audit

Signage

  • Is site safety signage present at all working areas

  • Is task specific signage present i.e., Roofing, Asbestos removal etc

  • Is signage present to instruct operatives of an incomplete scaffolding

Working Practices

  • Is there adequate site supervison

  • Are all young persons supervised all all time throughout the working day

  • Are all operatives working in accordence with the method statements

  • Are all operatives creating dust using dust serpression i.e., water, vaccum etc.

Access and Egress

  • Area all walkways free from obstruction and stored materials

  • Can safe access and egress be gain to working all areas

  • Is there adequate lighting in all working areas

Waste Management/Disposal

  • Is there adequate waste management on site

  • Are all skips suitably positioned

  • Are all skips fenced off to protect operatives, members of the public and damages during day to day tasks

  • Are waste disposal chutes available on site

  • Are all waste disposal chutes servicable and free from damage

  • Are waste disposal chutes in position prior to works comencing to avoid temptation of 'bombing'

  • Are all waste dispoal chutes used for there intended purpose

  • Is all waste being disposed of correctly on site (No Bombing)

Housekeeping

  • Is the site clean and well maintained

  • Are all materials/equipment stored so not to impede operatives

  • Are all materials/equipment stored so not to endanger mebers of the public

  • Are all damaged materials segregated/removed from site so they can not be used

Ladders

  • Are all ladders inspected by a competant person, and in date inspection

  • Are all ladders in good condition, free from dents, contamination, not split, warped, and have all rungs present

  • Are ladders beinging used for there intended purpose

  • Are ladders only being used for access/egress to a working platform, or for short duration only

  • Are all ladders etected againts a solid level surface, and not fragile or insecure material

  • Are all ladders tied to prevet them moved side to side and backwards

  • Are ladders erected the correct distance past any working lift (approx 1m or 5 Rungs)

  • Are ladders erect at the correct angle (1:4 or 75 degrees optimal)

Scaffolding/Working Platforms

  • All scaffolding works are to be carried out IAW NASC TG20:13 and associated SG's

  • Are all standards erected with base plates

  • Are all scaffoldings adequatly tied into building/structure

  • Are all complete, in use scaffoldings erected with minimum double handrail and single toe boards around every edge (no 'open ended' scaffolding)

  • Area all working lifts fully brick guarded

  • Are working platforms fully boarded, including inside boards, are they arranged in a way to avoid a tripping hazard

  • Do all internal ladders have self closing gates. Are operatives protected at all times whilst using the ladder

  • Are access/egress gates fitted at each access point. Are all gates servicable and free from damage

  • Are scaffolding tags in use. Does all the information on the tag refect the inspections carried out

  • Has the scaffolding been erected safely

  • Is a harness used by scaffolders during erection, alteration and dismantle

Personal Protective Equipment (PPE)

  • Are all operatives wearing Hi-Vis clothing

  • Are all operatives wearing hard hats where an overhead threat is present

  • Is all PPE sutible for the task being carried out

  • Are all operatives carrying out cutting operationd using suitable RPE and eye protection

  • Have all operatives issued with or owning RPE carried out a face fit test by a competent person

  • Are all hard hats issued in date

  • When multiple PPE is worn by one operative, are they all compatable

  • Are safety boots work at all times whilest on site

  • Is all PPE in use in good condition, free from contamination and damage

Summary

  • undefined

Sign off

  • Date and Time of Completion

  • Site Manger

  • Health and Safety Department Rep

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.