Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Scheme
-
Audit No
CDM Site Audit
Signage
-
Is site safety signage present at all working areas
-
Is task specific signage present i.e., Roofing, Asbestos removal etc
-
Is signage present to instruct operatives of an incomplete scaffolding
Working Practices
-
Is there adequate site supervison
-
Are all young persons supervised all all time throughout the working day
-
Are all operatives working in accordence with the method statements
-
Are all operatives creating dust using dust serpression i.e., water, vaccum etc.
Access and Egress
-
Area all walkways free from obstruction and stored materials
-
Can safe access and egress be gain to working all areas
-
Is there adequate lighting in all working areas
Waste Management/Disposal
-
Is there adequate waste management on site
-
Are all skips suitably positioned
-
Are all skips fenced off to protect operatives, members of the public and damages during day to day tasks
-
Are waste disposal chutes available on site
-
Are all waste disposal chutes servicable and free from damage
-
Are waste disposal chutes in position prior to works comencing to avoid temptation of 'bombing'
-
Are all waste dispoal chutes used for there intended purpose
-
Is all waste being disposed of correctly on site (No Bombing)
Housekeeping
-
Is the site clean and well maintained
-
Are all materials/equipment stored so not to impede operatives
-
Are all materials/equipment stored so not to endanger mebers of the public
-
Are all damaged materials segregated/removed from site so they can not be used
Ladders
-
Are all ladders inspected by a competant person, and in date inspection
-
Are all ladders in good condition, free from dents, contamination, not split, warped, and have all rungs present
-
Are ladders beinging used for there intended purpose
-
Are ladders only being used for access/egress to a working platform, or for short duration only
-
Are all ladders etected againts a solid level surface, and not fragile or insecure material
-
Are all ladders tied to prevet them moved side to side and backwards
-
Are ladders erected the correct distance past any working lift (approx 1m or 5 Rungs)
-
Are ladders erect at the correct angle (1:4 or 75 degrees optimal)
Scaffolding/Working Platforms
-
All scaffolding works are to be carried out IAW NASC TG20:13 and associated SG's
-
Are all standards erected with base plates
-
Are all scaffoldings adequatly tied into building/structure
-
Are all complete, in use scaffoldings erected with minimum double handrail and single toe boards around every edge (no 'open ended' scaffolding)
-
Area all working lifts fully brick guarded
-
Are working platforms fully boarded, including inside boards, are they arranged in a way to avoid a tripping hazard
-
Do all internal ladders have self closing gates. Are operatives protected at all times whilst using the ladder
-
Are access/egress gates fitted at each access point. Are all gates servicable and free from damage
-
Are scaffolding tags in use. Does all the information on the tag refect the inspections carried out
-
Has the scaffolding been erected safely
-
Is a harness used by scaffolders during erection, alteration and dismantle
Personal Protective Equipment (PPE)
-
Are all operatives wearing Hi-Vis clothing
-
Are all operatives wearing hard hats where an overhead threat is present
-
Is all PPE sutible for the task being carried out
-
Are all operatives carrying out cutting operationd using suitable RPE and eye protection
-
Have all operatives issued with or owning RPE carried out a face fit test by a competent person
-
Are all hard hats issued in date
-
When multiple PPE is worn by one operative, are they all compatable
-
Are safety boots work at all times whilest on site
-
Is all PPE in use in good condition, free from contamination and damage
Summary
-
undefined
Sign off
-
Date and Time of Completion
-
Site Manger
-
Health and Safety Department Rep