Pump Commissioning Checklist
Pump Commissioning
-
Is the completion of equipment installation in all respect as per respective drawings/documents?
-
Are bearings and hydraulic coupling lubricated with specified lubricant?
-
Are the couplings between in perfect alignment?
-
Are coupling bolts and guard installed?
-
Is the rotor free in its bearings?
-
Is the pump/engine rotating direction correctly? (The orientation of the pump must match the arrow.)
-
Are instrumentation and protection devices checked by simulation? Are measuring and monitoring instruments okay?
-
Is the Oil Flushing of Oil Circuit over successfully? Is new oil filled in the hydraulic coupling and oil circuit?
-
Is the reverse rotation detection switch on hydraulic coupling and protection okay?
-
Are holding-down bolts fitted securely?
-
Are leakage lines for drain, wind, and gland directed correctly to prevalent drains?
-
Are the automatic recirculation valves and back pressure valve correctly fitted in the recirculation line?
-
Are oil coolers, oil pipes, and cooling water pipelines installed properly as per Piping and Instrumentation Diagram (P&ID) and General Arrangement (GA)?
-
Are mechanical seals checked?
-
Are the Discharge Valves of Pumps kept closed?
-
Are Line Vents kept opened?