Gang 4
-
Give a description of the task
- Yes
- No
- N/A
-
Can all operatives demonstrate good knowledge of the task in hand?
-
Can all operatives demonstrate good knowledge of potential hazards in the proximity of the work area?
-
Is everyone signed onto the permits?
-
Is everyone signed onto the correct rams revision?
-
Has the excavation check sheet been filled in?
-
does the excavation have an in date excavation tag?
-
Have all plant check sheets been filled in?
-
Have all vehicle check sheets been filled in?
-
have all lifting equipment weekly inspections been recorded on the loler register?
-
Does all lifting equipment have an in date certificate?
-
is the lifting equipment stored correctly?
-
Are all operatives competency in date?
-
is there a permit to pump in place ?
-
is there a copy of the relevant temporary works designs?
-
is there a copy of the coshh assesments ?
-
is there a first aid box within adequate distance
-
is all static plant placed on a plant nappy or drip tray?
-
does all mobile plant have a spill kit ?
-
Has the havs register been filled in ?
-
Are all operatives wearing the correct p.p.e?
-
Is the work area tidy?
-
is there an adequate bucket changing area ?
-
has plant person interface been taken into consideration and if required an exclusion zone is in place ?
-
Is there good access and egress ?
-
Is there adequate edge protection?
-
is there adequate excavation support installed to the temporary works design?
-
has the excavation been stepped correctly if no excavation support required ?
-
is the ladder tied off and pertrudes no less then 1 meter above the footplate of the ladder access platform
-
is the davit arm within distance to erect if required ?
-
are operatives wearing harness's if required?