Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Level
- Ground Floor
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Level 6
- Level 7
- Level 8
- Level 9
- Level 10
- Level 11
- Level 12
- Level 13
- Level 14/Roof
-
Elevation/Section
-
Have all Vertical rails being installed as per design?
-
Has the correct drawing/setting out used in this area?
-
Have all rails being installed correctly following manufacturer's guidelines? (Fixed and sliding point.)
-
Have all rails being installed using the correct fixings?
Sign Off
-
Jessella
-
Client