Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Level

  • Elevation/Section

  • Have the correct pipe and components been used as per design?

  • Have the correct fixings being used?

  • Have all components been connected tightly?

  • Have all brackets been installed as per manufacturers details? (note: 2 per pipe length)

  • Have the pipes been installed straight and level?

Sign Off

  • Jessella

  • Client

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.